Laserfiche WebLink
SAN O A Q U f N COMMUNITY DEVELOPMENT DEPARTMENT <br /> SITE APPROVAL <br /> COUNTY <br /> FILE NUMBER: <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Cha ter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> Conventional.grading will be performed throughout the-project site but minimized to where practical to <br /> _reduce unnecessary-soil movement that may result in dust. Site preparation will be consistent with <br /> County BMPs and the S JVAPCD rules for dust control. Dust-minimizing techniques will be employed, <br /> such as placement of wind control fencing, application of water, and application of dust suppressants. <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposed project: <br /> INloise-generating construction activities will be limited to Monday through Saturday between 8:00 a.m. <br /> and 6:00 p.m. The contractor will conduct construction activities in such a manner that the maximum <br /> noise levels at the affected buildings will not exceed established noise levels. Project operation will <br /> entail minimal noise typically associated with electrical equipment. <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> During construction,deliveries of equipment and materials will generate an estimated five to seven <br /> 1roundtrips per day during peak construction periods. Construction is expected to take approximately 6 <br /> Ito 8 months during which equipment would generate short-term noise. Project operation will entail minimal <br /> noise typically associated with electrical equipment. <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> Permanent motion-sensitive, directional security lights will be installed to provide adequate illumination <br /> around the substation area and points of ingress/egress. All lighting will be shielded and directed <br /> downward to minimize the potential for glare or spillover onto adjacent properties. Security cameras <br /> will be placed on site and monitored 7 days a week and 24 hours per day. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> The project will not entail air emissions or other odor-generating components during operation. During <br /> construction, there is potential for equipment to generate short-term emissions that have the potential <br /> Ito odorous. <br /> Page 5 of 6 <br /> Updated 08/28/2020 <br />