My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5550
>
2600 - Land Use Program
>
PA-2000212
>
SU0014000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 12:48:43 PM
Creation date
4/7/2021 2:17:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014000
PE
2631
FACILITY_NAME
PA-2000212
STREET_NUMBER
5550
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
08705409
ENTERED_DATE
3/10/2021 12:00:00 AM
SITE_LOCATION
5550 E CHEROKEE RD
RECEIVED_DATE
4/6/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN O A Q U f N COMMUNITY DEVELOPMENT DEPARTMENT <br /> SITE APPROVAL <br /> COUNTY <br /> FILE NUMBER: <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Cha ter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> Conventional.grading will be performed throughout the-project site but minimized to where practical to <br /> _reduce unnecessary-soil movement that may result in dust. Site preparation will be consistent with <br /> County BMPs and the S JVAPCD rules for dust control. Dust-minimizing techniques will be employed, <br /> such as placement of wind control fencing, application of water, and application of dust suppressants. <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposed project: <br /> INloise-generating construction activities will be limited to Monday through Saturday between 8:00 a.m. <br /> and 6:00 p.m. The contractor will conduct construction activities in such a manner that the maximum <br /> noise levels at the affected buildings will not exceed established noise levels. Project operation will <br /> entail minimal noise typically associated with electrical equipment. <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> During construction,deliveries of equipment and materials will generate an estimated five to seven <br /> 1roundtrips per day during peak construction periods. Construction is expected to take approximately 6 <br /> Ito 8 months during which equipment would generate short-term noise. Project operation will entail minimal <br /> noise typically associated with electrical equipment. <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> Permanent motion-sensitive, directional security lights will be installed to provide adequate illumination <br /> around the substation area and points of ingress/egress. All lighting will be shielded and directed <br /> downward to minimize the potential for glare or spillover onto adjacent properties. Security cameras <br /> will be placed on site and monitored 7 days a week and 24 hours per day. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> The project will not entail air emissions or other odor-generating components during operation. During <br /> construction, there is potential for equipment to generate short-term emissions that have the potential <br /> Ito odorous. <br /> Page 5 of 6 <br /> Updated 08/28/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.