Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: PM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 73 57 139 98 55 102 141 283 111 107 373 48 <br /> Future Volume(veh/h) 73 57 139 98 55 102 141 283 111 107 373 48 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 97 76 185 107 60 111 153 308 121 127 444 57 <br /> Peak Hour Factor 0.75 0.75 0.75 0.92 0.92 0.92 0.92 0.92 0.92 0.84 0.84 0.84 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 124 98 238 137 396 332 193 424 166 164 512 66 <br /> Arrive On Green 0.07 0.20 0.20 0.08 0.21 0.21 0.11 0.33 0.33 0.09 0.32 0.32 <br /> Sat Flow,vehlh 1781 479 1165 1781 1870 1566 1781 1277 502 1781 1624 208 <br /> Grp Volume(v),veh/h 97 0 261 107 60 111 153 0 429 127 0 501 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1644 1781 1870 1566 1781 0 1779 1781 0 1832 <br /> Q Serve(g_s),s 3.3 0.0 9.2 3.6 1.6 3.7 5.1 0.0 13.0 4.3 0.0 15.7 <br /> Cycle Q Clear(g_c),s 3.3 0.0 9.2 3.6 1.6 3.7 5.1 0.0 13.0 4.3 0.0 15.7 <br /> Prop In Lane 1.00 0.71 1.00 1.00 1.00 0.28 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 124 0 336 137 396 332 193 0 590 164 0 578 <br /> V/C Ratio(X) 0.78 0.00 0.78 0.78 0.15 0.33 0.79 0.00 0.73 0.77 0.00 0.87 <br /> Avail Cap(c_a),veh/h 160 0 484 190 582 487 248 0 609 338 0 720 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 27.9 0.0 23.0 27.7 19.6 20.4 26.5 0.0 18.0 27.1 0.0 19.7 <br /> Incr Delay(d2),s/veh 16.8 0.0 4.9 13.0 0.2 0.6 12.5 0.0 4.2 7.5 0.0 9.2 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 1.9 0.0 3.7 1.9 0.7 1.3 2.6 0.0 5.0 2.0 0.0 7.0 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 44.7 0.0 27.9 40.7 19.8 21.0 39.0 0.0 22.2 34.6 0.0 28.9 <br /> LnGrp LOS D A C D B C D A C C A C <br /> Approach Vol,veh/h 358 278 582 628 <br /> Approach Delay,s/veh 32.5 28.3 26.6 30.1 <br /> Approach LOS C C C C <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 10.1 24.7 9.2 17.0 11.1 23.8 8.8 17.4 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 11.6 20.9 6.5 18.0 8.5 24.0 5.5 19.0 <br /> Max Q Clear Time(g_c+11),s 6.3 15.0 5.6 11.2 7.1 17.7 5.3 5.7 <br /> Green Ext Time(p-c),s 0.1 1.2 0.0 0.8 0.0 1.5 0.0 0.5 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 29.2 <br /> HCM 6th LOS C <br /> Pock Lane Residential TIS: Existing Conditions, 10/26/20214:00 pm Synchro 11 Report <br /> TJKM Page 1 <br />