Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: PM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 86 71 198 116 72 121 224 335 131 126 441 57 <br /> Future Volume(veh/h) 86 71 198 116 72 121 224 335 131 126 441 57 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 115 95 264 126 78 132 243 364 142 150 525 68 <br /> Peak Hour Factor 0.75 0.75 0.75 0.92 0.92 0.92 0.92 0.92 0.92 0.84 0.84 0.84 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 131 104 289 154 474 398 202 420 164 188 519 67 <br /> Arrive On Green 0.07 0.24 0.24 0.09 0.25 0.25 0.11 0.33 0.33 0.11 0.32 0.32 <br /> Sat Flow,vehlh 1781 434 1205 1781 1870 1569 1781 1280 499 1781 1622 210 <br /> Grp Volume(v),veh/h 115 0 359 126 78 132 243 0 506 150 0 593 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1639 1781 1870 1569 1781 0 1780 1781 0 1832 <br /> Q Serve(g_s),s 4.8 0.0 16.0 5.2 2.4 5.1 8.5 0.0 20.0 6.2 0.0 24.0 <br /> Cycle Q Clear(g_c),s 4.8 0.0 16.0 5.2 2.4 5.1 8.5 0.0 20.0 6.2 0.0 24.0 <br /> Prop In Lane 1.00 0.74 1.00 1.00 1.00 0.28 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 131 0 393 154 474 398 202 0 583 188 0 586 <br /> V/C Ratio(X) 0.88 0.00 0.91 0.82 0.16 0.33 1.20 0.00 0.87 0.80 0.00 1.01 <br /> Avail Cap(c_a),veh/h 131 0 393 154 474 398 202 0 583 276 0 586 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 34.4 0.0 27.7 33.7 21.8 22.8 33.2 0.0 23.7 32.8 0.0 25.5 <br /> Incr Delay(d2),s/veh 44.9 0.0 25.2 27.6 0.2 0.5 129.0 0.0 13.1 9.8 0.0 40.0 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 3.6 0.0 8.6 3.3 1.0 1.8 10.6 0.0 9.4 3.0 0.0 15.7 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 79.3 0.0 53.0 61.3 22.0 23.3 162.3 0.0 36.8 42.5 0.0 65.5 <br /> LnGrp LOS E A D E C C F A D D A F <br /> Approach Vol,veh/h 474 336 749 743 <br /> Approach Delay,s/veh 59.4 37.2 77.5 60.9 <br /> Approach LOS E D E E <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 12.4 29.1 11.0 22.5 13.0 28.5 10.0 23.5 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 11.6 20.9 6.5 18.0 8.5 24.0 5.5 19.0 <br /> Max Q Clear Time(g_c+11),s 8.2 22.0 7.2 18.0 10.5 26.0 6.8 7.1 <br /> Green Ext Time(p-c),s 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 62.5 <br /> HCM 6th LOS E <br /> Pock Lane Residential TIS:Cumulative plus Project Conditions Synchro 11 Report <br /> TJKM Page 1 <br />