Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: PM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 86 71 198 116 72 121 224 335 131 126 441 57 <br /> Future Volume(veh/h) 86 71 198 116 72 121 224 335 131 126 441 57 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 115 95 264 126 78 132 243 364 142 150 525 68 <br /> Peak Hour Factor 0.75 0.75 0.75 0.92 0.92 0.92 0.92 0.92 0.92 0.84 0.84 0.84 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 144 89 246 156 396 331 278 511 200 184 563 73 <br /> Arrive On Green 0.08 0.20 0.20 0.09 0.21 0.21 0.16 0.40 0.40 0.10 0.35 0.35 <br /> Sat Flow,vehlh 1781 433 1203 1781 1870 1566 1781 1280 499 1781 1622 210 <br /> Grp Volume(v),veh/h 115 0 359 126 78 132 243 0 506 150 0 593 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1636 1781 1870 1566 1781 0 1780 1781 0 1832 <br /> Q Serve(g_s),s 5.6 0.0 18.0 6.1 3.0 6.4 11.7 0.0 21.0 7.2 0.0 27.5 <br /> Cycle Q Clear(g_c),s 5.6 0.0 18.0 6.1 3.0 6.4 11.7 0.0 21.0 7.2 0.0 27.5 <br /> Prop In Lane 1.00 0.74 1.00 1.00 1.00 0.28 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 144 0 335 156 396 331 278 0 711 184 0 636 <br /> V/C Ratio(X) 0.80 0.00 1.07 0.81 0.20 0.40 0.88 0.00 0.71 0.82 0.00 0.93 <br /> Avail Cap(c_a),veh/h 144 0 335 156 396 331 282 0 711 229 0 675 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 39.7 0.0 34.9 39.4 28.5 29.8 36.3 0.0 22.1 38.6 0.0 27.7 <br /> Incr Delay(d2),s/veh 26.4 0.0 69.4 26.0 0.2 0.8 24.8 0.0 3.3 16.5 0.0 19.4 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 3.4 0.0 13.3 3.7 1.3 2.4 6.6 0.0 8.3 3.8 0.0 14.3 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 66.1 0.0 104.3 65.3 28.7 30.6 61.0 0.0 25.5 55.1 0.0 47.1 <br /> LnGrp LOS E A F E C C E A C E A D <br /> Approach Vol,veh/h 474 336 749 743 <br /> Approach Delay,s/veh 95.0 43.2 37.0 48.7 <br /> Approach LOS F D D D <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 13.6 39.6 12.2 22.5 18.2 35.0 11.6 23.1 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 11.3 35.0 7.7 18.0 13.9 32.4 7.1 18.6 <br /> Max Q Clear Time(g_c+11),s 9.2 23.0 8.1 20.0 13.7 29.5 7.6 8.4 <br /> Green Ext Time(p-c),s 0.1 2.3 0.0 0.0 0.0 1.0 0.0 0.5 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 53.6 <br /> HCM 6th LOS D <br /> Pock Lane Residential TIS:Cumulative plus Project Conditions-Non-Signal Mitigation Synchro 11 Report <br /> TJKM Page 1 <br />