Laserfiche WebLink
h. Streets'A', 'B', 'C', 'D', 'E', 'F'and Loomis Road shall be dedicated on the Final Map and improved <br /> to County Standards for a 50-foot right-of-way urban residential road. (Development Title Sections <br /> 9-857.4, 9-11502[d][3]and 9-1150.5[b]) <br /> i. The roadway improvements for Pock Lane shall be constructed in conformance with the standards <br /> for one-half of a 50-foot-wide right-of-way urban residential road. The improvements shall be in <br /> conformance with the current Improvement Standards of the County of San Joaquin. Improvement <br /> plans, specifications and engineer's estimate prepared by a registered civil engineer shall be <br /> submitted for review and are subject to plan check, field inspection fees and must be approved by <br /> the County of San Joaquin Department of Public Works prior to issuance of the building permit. <br /> (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> j. Street lighting shall be provided for the proposed subdivision in accordance with San Joaquin <br /> County's current Improvement Standards and complete any necessary requirements to connect <br /> power to the streetlights(including application to Pacific Gas and Electric Company and installation <br /> of any necessary power facilities) (Development Title Section 9-1150.11) <br /> k. The project shall be served by a public storm drain system with terminal drainage in accordance <br /> with the County requirements and to provide adequate drainage for the subdivision. Hydrologic and <br /> hydraulic analyses shall be provided and demonstrate that all property, both downstream and <br /> upstream of the discharge, will not be subject to a higher flood level as a result of the proposed <br /> drainage. (Development Title Section 9-1135.2) <br /> I. Applicant shall provide a will-serve letter from an existing district or agency for storm drainage and <br /> street lighting or form a new community services district, community facilities district or other non- <br /> County public utility agency to provide for operation and maintenance of the storm drain system <br /> and streetlights in perpetuity. Applicant is responsible for initial financing, design and construction <br /> of the infrastructure facilities, subject to County review and approval. If creating a new non-County <br /> public utility agency, it shall be in place prior to approval of the final map. <br /> m. The project shall be served by a public water system conforming to the requirements of the San <br /> Joaquin County Environmental Health Department and the Department of Public Works. The <br /> system shall provide adequate domestic and fire water supply in conformance to the requirements <br /> of the County Fire Warden and the local Fire District. (Development Title Section 9-1120.2) <br /> n. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of the San Joaquin County Environmental Health Department <br /> and the Department of Public Works. (Development Title Section 9-1105.2) <br /> o. It is the responsibility of the applicant to ensure that a current will serve letter for sanitary sewer <br /> and water service is on file prior to approval of the Final Map. <br /> p. The subdivider shall agree to pay user fees for the utility services from the time improvements are <br /> accepted by the County until the lots are placed on the County tax rolls. <br /> q. Access rights shall be dedicated and restricted for lots 1-6 along the frontage of Pock Lane on the <br /> Final Map. (Development Title Section 9-1150.5) <br /> r. This project is a NPDES Phase II regulated area and shall comply with the following conditions. <br /> Prior to approval of the final map, plans and calculations shall be submitted and approved by the <br /> Public Works Department—Water Resources Division (209-468-9360): <br /> 1. Treatment:A registered professional engineer shall design the site to treat the 85th percentile <br /> storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan (SWQCCP). <br /> s. Applicant shall file a Notice of Intent(NO])with the State Water Resources Control Board(SWRCB) <br /> and comply with the State "General Permit for Storm Water Discharges Associated with <br /> Construction Activity". The Waste Discharge Identification Number (WDID), issued by SWRCB, <br /> PA-2100031, 32, 61, 62 (ZR, SU) Conditions of Approval 9 <br />