Laserfiche WebLink
shall be submitted to Public Works for file. Contact the SWRCB at (916) 341-5250 for further <br /> information. <br /> t. Applicant shall submit the Storm Water Pollution Prevention Plan (SWPPP) to Public Works. A <br /> copy of the approved SWPPP and all required records, updates,test results and inspection reports <br /> shall be maintained on the construction site and be available for review upon request. <br /> u. Prior to approval of the final map,the owner shall enter into an agreement with San Joaquin County <br /> for post-construction maintenance of stormwater quality facilities. <br /> v. The roadway improvements for Pock Lane shall include a right turn lane at the Mariposa Road <br /> intersection. <br /> 4. ENVIRONMENTAL HEALTH DEPARTMENT(Contact: [209]468-3420) <br /> a. A qualified environmental professional shall prepare a surface and subsurface contamination <br /> report, identifying any potential source of surface or subsurface contamination caused by past or <br /> current land uses. The report shall include evaluation of non-point source of hazardous materials, <br /> including agricultural chemical residues, as well as potential point sources, such as fuel storage <br /> tanks, septic systems, or chemical storage areas. The report shall be submitted to the <br /> Environmental Health Department at time of submittal of a tentative map (San Joaquin County <br /> Development Title, Section 9-905.12). <br /> Note: EHD has received Phase I Environmental Site Assessment report dated December 14, and <br /> will require a limited sampling of the surface soil of the subject property to analyze the presence of <br /> residual pesticides prior to recordation of final map. Please refer to EHD response letter to Phase <br /> Environmental Site Assessment dated April 7, 2021. <br /> b. Prior to the issuance of any building permits, sewer facilities shall either be bonded for or be in <br /> place, as evidenced by a letter from the serving entity (San Joaquin County Development Title, <br /> Section 9-1100.3[d]). <br /> Note:A will-serve letter from the City of Stockton for sewer service provisions has been received. <br /> c. This project shall be provided with public water service at the time of Final Map recordation.A letter <br /> shall be submitted from the purveyor stating that these services either are bonded for or are in <br /> place, prior to final approval (San Joaquin County Development Title, Section 9-1120.2). <br /> Note:A will-serve letter from California Water Service for water provisions has been received. <br /> d. The existing homesite may continue to use the existing well and septic system until a repair or <br /> replacement is needed. When a repair or replacement is needed connection to public services is <br /> required. (San Joaquin County Development Title, Section 9-1120.2, 9-1105.2). <br /> e. The existing private water well located on the existing homesite shall be tested for the chemical <br /> Dibromochloropropane(DBCP)and nitrates with the results submitted to the Environmental Health <br /> Department. Samples are to be taken and analyzed by a State-approved laboratory (San Joaquin <br /> County Development Title, Section 9-1115.7). <br /> f. Destroy the abandoned agricultural well located in the open field under permit and inspection by <br /> the Environmental Health Department as required by San Joaquin County Development Title, <br /> Section 9-1115.5(e). <br /> g. Any geotechnical drilling shall be conducted under permit and inspection by The Environmental <br /> Health Department(San Joaquin County Development Title, Section 9-1115.3 and 9-1115.6). <br /> 5. DEPARTMENT OF PARKS AND RECREATION (Contact: [209]331-2020) <br /> a. The collection of in-lieu fees for park development is a requirement for approval of any new residential <br /> PA-2100031, 32, 61, 62 (ZR, SU) Conditions of Approval 10 <br />