Laserfiche WebLink
-4- <br /> PA-2100061 (ZR)&-062(SU) <br /> 18) This project is a NPDES Phase II regulated area and shall comply with the following conditions. <br /> Prior to approval of the final map,plans and calculations shall be submitted and approved by the <br /> Public Works Department—Water Resources Division(209-468-9360): <br /> a. Treatment:A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan <br /> (SWQCCP). <br /> 19) Applicant shall file a Notice of Intent(NOI)with the State Water Resources Control Board <br /> (SWRCB)and comply with the State"General Permit for Storm Water Discharges Associated with <br /> Construction Activity".The Waste Discharge Identification Number(WDID),issued by SWRCB, <br /> shall be submitted to Public Works for file.Contact the SWRCB at(916)341-5250 for further <br /> information. <br /> 20) Applicant shall submit the Storm Water Pollution Prevention Plan(SWPPP)to Public Works.A <br /> copy of the approved SWPPP and all required records,updates,test results and inspection <br /> reports shall be maintained on the construction site and be available for review upon request. <br /> 21) Prior to approval of the final map,the owner shall enter into an agreement with San Joaquin <br /> County for post-construction maintenance of stormwater quality facilities. <br /> 22) The roadway improvements for Pock Lane shall include a right turn lane at the Mariposa Road <br /> intersection. <br /> AC:CH <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 8 <br />