Laserfiche WebLink
, Department of Public Works <br /> SAN 0 A Q U I N <br /> Kris Balaji,Director of Public Works <br /> COUP. [Y >" ,I <br /> ` = Fritz Buchman,Deputy Directm,Developmer.•t <br /> David Tolliver,i)ecuty Di;ecteriO:erat;ons <br /> Najee Zarif,Deputy Directen'Engincering <br /> Kristi Rhea,Business Administrator <br /> May 6,2022 <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON:Giuseppe Sanfilippo <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-2100031 (ZR)&-032(SU);A Zone Reclassification and Vested Major Subdivision <br /> application.A Zone Reclassification application to rezone a 23-acre parcel from <br /> Agricultural Urban Reserve—20-acre minimum(AU-20)to Low Density Residential(R- <br /> L).The General Plan designation is Low Density Residential(RIL).A Vested Major <br /> Subdivision application to subdivide a 23-acre parcel into(10B)residential lots;located <br /> on the west side of South Pock Lane, 1,503 feet north of East Carpenter Road, Stockton. <br /> (Supervisorial District 1) <br /> OWNER: Pock Lane Partners, LLC. APPLICANT:Same <br /> ADDRESS: 3009 S.Pock Lane,Stockton APN: 179-120-11 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area designated as Zone X and AE.The 100-Year Flood Elevation will be approximately 24.9 <br /> feet NAVD 1988. <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System(NPDES). <br /> Pock Lane has an existing and planned right-of-way width of 50 feet_ <br /> Loomis Road has an existing and planned right-of-way width of 60 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed.The fee is due <br /> and payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. The <br /> fee is due and payable at the time of building permit application <br /> 1810 East Hazefton Avenue I Stockton,California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> In Follow us on Facebook(q)PublicWorksSJC Visit our website: wow.sigov.orglpubworks <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 9 <br />