Laserfiche WebLink
San Joaquin VaAey A kPWition ContmiO Odd P89e7 <br /> District Reference No.20210504 <br /> June 44,2020 <br /> a rail or bus station,is called atransit-oriented development(TOD). The project <br /> description should include,at a minimum,the following design features: <br /> • A transit station/stop with high-quality, high-frequency bus service <br /> located within a 5-10 minute walk(or roughly %mile from stop to edge <br /> of development),and/or <br /> • A rail station located within a 20 minute walk (or roughly %2 mile from <br /> station to edge of development) <br /> • Fast, frequent, and reliable transit service connecting to a high <br /> percentage of regional destinations <br /> • Neighborhood designed for walking and cycling <br /> 7) District Comment Letter <br /> The District recommends that a copy of the District's comments be provided to the <br /> Project proponent. <br /> If you have any questions or require further information,please contact Patrick Chimienti <br /> by e-mail at Patrick.chimientiCc)valleyair.ora or by phone at(559)230-6139. <br /> Sincerely, <br /> Brian Clements <br /> Director of Permit Services <br /> For John Stagnaro <br /> Program Manager <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 43 <br />