Laserfiche WebLink
SANJ0AQUIN p <br /> Q'°� �� Environmental Health Department <br /> COUNTY Jasjit Kang, REHS, Director <br /> Greatness grows here. Muniappa Naidu,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco,REHS, RDI <br /> Willy Ng, REHS <br /> Melissa Nissim, REHS <br /> Steven Shih, REHS <br /> August 5, 2021 <br /> To: San Joaquin County Community Development Department <br /> Attention: Allsa Goulart <br /> From: Naseem Ahmed; 209-616-3018 <br /> Senior Registered Environmental Health Specialist <br /> RE: PA-2100045 (UP), Referral, S00014031 <br /> 1525 E. Jahant Rd, Acampo <br /> The following requirements have been identified as pertinent to this project. Other requirements may also <br /> apply. These requirements cannot be modified. <br /> 1. Applicant shall contact Robert McClellon, Program Coordinator, Small Public Water System <br /> Program, at (209) 468-0332, to determine if the existing well can be permitted as a public water <br /> system prior to issuance of building permits. If a public water system is required, applicant shall <br /> submit a Small Public Water System preliminary technical report to the California State Water <br /> Resources Control Board, Division of Drinking Water (Water Board) at least six months before <br /> initiating construction of any water related improvement, as defined. The issuance of a permit to <br /> operate a small public water system by the local primacy agency (EHD) is prohibited without the <br /> concurrence of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br /> Drinking Water at (209): 948-3963 concerning the requirements for preliminary technical report <br /> submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, a permit <br /> application to operate Small Public Water System shall be submitted to the EHD for approval prior <br /> to issuance of building permits. To issue a permit to operate, concurrence from the Water Board is <br /> required. A yearly permit to operate a public water system will be required by the EHD prior to sign <br /> off the certificate of final occupancy (San Joaquin County Development Title, Section 9-1120.2 and <br /> 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin County <br /> Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health and Safety <br /> Code, Section 116525 116570. <br /> Note: Per conversation with Robert McClellon, the applicant is currently in process of obtaining <br /> permit for a small public water system. <br /> 2. Any geotechnical drilling shall be conducted under permit and inspection by The Environmental <br /> Health Department (San Joaquin County Development Title, Section 9-1115.3 and 9-1115.6). <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />