My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Due to the presence of elevated concentrations of petroleum hydrocarbons in the tank pit soil <br />samples, further investigation was required by San Joaquin County Public Health Services, <br />Environmental Health Division (PHS/EHD). <br />In a two -phased approach beginning on November 1, 1990, RESNA Industries, Inc. personnel <br />advanced six soil borings (MW1 through MW6) to depths ranging from 27 to 30 feet below <br />ground surface (bgs) at the project site to accomplish the following: 1) define the lateral and <br />vertical extent of hydrocarbon impacted soils; 2) determine soil stratigraphy; and 3) install <br />groundwater monitoring wells within the uppermost aquifer in order to assess groundwater <br />quality. The boring/well locations are plotted on Figure 2. Field methodology and analytical <br />results are discussed in detail in RESNA's Interim Problem Assessment Report, dated January 13, <br />1992. <br />The site's station building and garage were demolished in December 1994 to facilitate corrective <br />action activities including the removal of hydrocarbon contaminated soil which was present <br />beneath the station building. The demolition of the station building was requested in PHS/EHD <br />correspondence dated July 7, 1994. A required demolition asbestos survey conducted previously <br />on the station building determined the presence of asbestos containing materials. E. T. <br />Abatement, of Modesto, California, properly removed and disposed of the site's suspected <br />asbestos containing materials on November 11, 1994. <br />In February 1995, Smith Technology personnel supervised the excavation of approximately 1,400 <br />cubic yards of soil from the vicinity of the former underground storage tanks. Approximately <br />10,000 gallons of groundwater was pumped from the open excavation into an on-site Baker Tank. <br />Following the collection of confirmation soil samples, the excavation pit was backfilled with <br />imported self compacting material. The excavation was limited to the northwest by a municipal <br />well compound and associated underground utilities (including a high volume six-inch water <br />main) and to the northeast by a postal building. Excavation activities are discussed in detail in <br />Smith Technology's Excavation Summary Report, dated October 24, 1995. <br />On November 26 and 27, 1996, a total of eight soil borings (SB 1 through SB 8) were advanced to <br />depths ranging from approximately 20.5 to 45.5 feet bgs under the supervision of Smith <br />Technology. The boring locations are shown on Figures 3 and 4. The distribution of residual <br />TPHg and benzene in soil beneath the site is generally between 11 and 30 feet bgs and extends <br />approximately 70 feet from north of the former UST excavation near the Thornton Municipal <br />Supply Well No. 2 compound and associated underground water lines. Benzene was generally <br />detected between 20 and 26 feet bgs in the vicinity of borings SB2, SB4, SB6 and SB8 and at 11 <br />feet bgs in MW4. The lateral extent of benzene in soil is shown on Figure 3. The estimated <br />lateral extents of benzene concentrations in groundwater during this subsurface investigation data <br />are presented on Figure 4. The results of the November 1996 investigation is summarized in <br />Smith Technology's aforementioned Problem Assessment Report - Interim Remedial Plan dated <br />September 4, 1997. <br />• <br />WA94326\REPORTS\WRKPLN.EM 2 � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.