Laserfiche WebLink
hydrocarbon impact will be submitted for laboratory analysis. Soil samples submitted for laboratory <br />analysis will be collected in stainless steel tubes, capped with TeflonTM, labeled, entered onto a <br />chain-of-custody form, packed on ice, and sent to BC Laboratories, Inc., (BC Lab) of Bakersfield, <br />California. <br /> <br />5.7 Laboratory Analysis <br />Soil samples submitted to BC Lab for laboratory anaylsis will be analyzed for the following: <br />TPHg by EPA Method 8260B <br />Benzene, toluene, ethylbenzene, and total xylenes (BTEX) by EPA Method 8260B <br />Methyl tertiary butyl ether (MTBE), tertiary butyl alcohol (TBA), ethyl tert-butyl ether (ETBE), <br />diisopropyl ether (DIPE), ethylene dibromide (EDB), 1,2-DCA, tertiary amyl methyl ether <br />(TAME), ethanol, and naphthalene by EPA Method 8260B <br />All soil samples will be analyzed on a standard turnaround time. <br />5.8 Decontamination <br />Reusable downhole drilling and sampling equipment will be decontaminated before each use. The <br />decontamination station will include a self-contained wash bin, steam cleaner, and holding tank to <br />decontaminate equipment. All equipment will be decontaminated with a pressure washer and <br />scrubbed with Alconox. Decontamination water will be stored onsite in 55-gallon drums and <br />managed as described in Section 5.9. <br /> <br />5.9 Investigation Derived Waste Disposal <br />Soil cuttings, decontamination rinsate, and groundwater generated during field activities will be <br />temporarily stored onsite. Soil and water will be segregated and placed in Department of <br />Transportation compliant 55-gallon drums, labeled, and stored in a designated area onsite. The <br />drums will be sampled for waste characterization and transported to an approved facility for disposal <br />following receipt of analytical results. <br />5.10 Monitoring Well Development and Survey <br />After a minimum of 72-hours after installation, the newly installed monitoring wells will be developed <br />using a combination of groundwater surging and extraction to dislodge fine sediments from the sand <br />pack and remove sediments from the well. Surging and extraction will continue until at least ten <br />well casing volumes of groundwater are extracted and sediment volume in the groundwater is <br />negligible. The wells will be surveyed by a California state licensed surveyor. <br />5.11 Groundwater Sampling <br />Following monitoring well installation, development, and surveying, the wells will be added to the <br />existing groundwater monitoring and sampling schedule and sampled on a semi-annual basis. Prior <br />to collecting groundwater samples, at least three well casing volumes of groundwater will be purged <br />and groundwater pH, conductivity, and temperature parameters have stabilized. Groundwater <br />GHD I Well Installation Work Plan Addendum 111193145(5)1 Page 5