Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
samples will be collected using bailers or pumps and decanted into the appropriate containers <br />supplied by the analytical laboratory. Samples will be labeled, stored on ice at or below 4 degrees <br />Celsius, and transported under chain-of-custody to the laboratory. <br />5.12 Water Supply Well Survey <br />GHD plans to conduct an additional water supply well survey in the immediate vicinity of the site to <br />ensure residences located near the site are connected to a water service. The nearest known <br />water supply well (Well 10) is located approximately 1,020 feet downgradient of the site. To verify <br />that this is the nearest water supply well, GHD will contact California Water Service of Stockton to <br />determine if all local residences are currently connected to the municipal water supply. <br />Furthermore, GHD will conduct a door-to-door survey to identify any other water supply wells in the <br />immediate vicinity of the site. <br />5.13 Schedule and Reporting <br />GHD will implement the proposed amended work plan after receiving approval from the CVRWQCB, <br />or within 60 days of work plan submittal. GHD will prepare and submit Department of Water <br />Resources (DWR) Well Completion Reports (Form 188) to the DWR, and will submit a well <br />installation report summarizing site assessment activities to the CVRWQCB within 90 days of <br />completing the fieldwork. The report will include all analytical laboratory reports, permits, and <br />provide conclusions and recommendations. <br />GHD I Well Installation Work Plan Addendum 111193145(5)1 Page 6