My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
1600 - Food Program
>
PR0546651
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 2:36:35 PM
Creation date
4/14/2021 8:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546651
PE
1623
FACILITY_ID
FA0026478
FACILITY_NAME
LA MICHOACANA PLUS
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3081 N TRACY BLVD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA NUJ O A Q U I N Environmental Health Department <br /> COUNTY— <br /> than twenty-four (24) inches. Splash guard shall be at least six (6) inches in height <br /> from back edge to front edge [CRFC §113953]. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br /> inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of <br /> $152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or <br /> reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br /> be accepted for the construction or operation of a food facility. Any variance from the <br /> requirements outlined in this letter will require written approval from the EHD. Approval of the <br /> submitted plans shall become null and void if the work authorized is not commenced within 180 <br /> days from the date of approval, or the work authorized by such plans is abandoned. In order to <br /> renew action on an expired plan approval, the applicant shall submit fees equal to that of a new <br /> plan review. A copy of the approved plans shall be available on site at the time of final <br /> inspection. <br /> If you have any questions, please contact Kadeanne Linhares, Environmental Health <br /> Specialist, at (209) 209-616-3025. <br /> Sincerely, <br /> 4 <br /> Jeff Carruesco, RENS, RDI <br /> Program Coordinator <br /> JCNP:kl <br /> 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.