My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
1900 - Hazardous Materials Program
>
PR0519994
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 3:48:12 PM
Creation date
4/15/2021 12:02:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0519994
PE
1921
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Management Plan(EPlan) <br /> Rev 26 <br /> January 2021 <br /> onsite death, appropriate actions will be taken by PFD to preserve the scene until appropriate law <br /> enforcement(e.g., LPD, CHP, Coroner) assumes control. <br /> The ED, IC, or ES&H Team Leader will use established reentry provisions when the emergency <br /> condition has stabilized and radiological or other hazardous material releases, if any, have been <br /> controlled and contained within established limits. The IC or ES&H Team Leader must authorize <br /> reentry actions that are conducted prior to the termination of the emergency. <br /> Operational planning for facility reentry is the responsibility of the IC or ES&H Team Leader <br /> until the emergency has been terminated and will require detailed planning and consideration of <br /> safety precautions, including the use of appropriate protective clothing, respiratory protection, <br /> and specific criteria for aborting reentry. <br /> The ED is responsible for appointing a Recovery Manager, with concurrence of line management <br /> and the EBCC, who is knowledgeable of the affected facility and will be responsible for <br /> developing and coordinating plans and schedules for recovery operations for both the facility and <br /> LLNL site. Plans and schedules for recovery operations must consider methods for protecting <br /> workers, other onsite personnel, and the general public. Once a Recovery Manager has been <br /> appointed, local planning for facility-level recovery will require Recovery Manager approval of a <br /> Recovery Plan. <br /> The EOC, in coordination with NNSA/LFO and appropriate offsite agencies, is the focal point <br /> for the development of information to be disseminated to Federal, State, and local organizations <br /> regarding the emergency status and recovery operations. Recovery planning status information <br /> for the public will be released through appropriate State/local government agencies at either the <br /> JIC or individual agency public affairs offices. <br /> 11.2.1 Recovery Organization <br /> Prior to emergency termination, a recovery organization will be established by the appropriate <br /> line management and led by a designated Recovery Manager. Support staff to the recovery <br /> organization may include, but is not limited to, advisors from the following: Environmental <br /> Functional Area, Worker, Safety & Health Functional Area, HSD, Operations and Business, <br /> PAO, and the Security Organization. Administrative, logistical, communications, and personnel <br /> support for the recovery effort are the responsibility of the Recovery Manager's department or <br /> program. <br /> The responsibilities of the Recovery Manager may include: <br /> • Meeting with the EBCC and/or Laboratory Director to develop a prioritization of critical <br /> programs, facilities, and operations for recovery <br /> • Developing the overall strategic Recovery Plan Outline following an Operational <br /> Emergency that interrupts normal operation of the Laboratory <br /> • Developing and/or approving a written Recovery Plan for a facility <br /> • Selecting personnel to lead the recovery team functional areas: Finance/Administration, <br /> Logistics, Operations, and Planning <br /> 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.