My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
1900 - Hazardous Materials Program
>
PR0519994
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 3:48:12 PM
Creation date
4/15/2021 12:02:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0519994
PE
1921
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Management Plan(EPlan) <br /> Rev 26 <br /> January 2021 <br /> The Recovery Manager has responsibility for the recovery phase. Once this phase begins, the <br /> recovery team, in conjunction with the ES&H Team Leader, will provide the assessments above <br /> to the Recovery Manager. <br /> 11.2.4 Recovery Plan <br /> The Recovery Plan, developed by the recovery team, is based on the information developed as <br /> described in Section 11.2.3 above, and may consist of the following elements: <br /> • Identification of the impacted area through sampling and monitoring surveys. <br /> • Identification of impacted facilities within the impacted area, and prioritization of these <br /> facilities based on their functional importance. The identified facilities will also include <br /> affected utility systems such as power, water, and communications. <br /> • Characterization of hazards and identification of appropriate remediation methodologies. <br /> • Identification of available recovery resources and those that must be obtained from an <br /> alternate source. <br /> • Prioritization of recovery tasks. <br /> • Recovery schedule. The schedule may be updated as new resources are acquired and <br /> priorities are identified or shifted. <br /> • Procurement of additional resources to support recovery operations. <br /> • Notifications to and coordination with offsite agencies, including applicable regulatory <br /> notifications (e.g., the EPA). <br /> • Identification of procedures and ES&H documentation(e.g., Integration Work Sheets, <br /> Document Safety Analyses, Unreviewed Safety Questions)needed for the recovery <br /> effort. <br /> • Identification of critical activities and priority for resumption. <br /> 11.2.5 Resumption of Normal Operations <br /> When the criteria established by the recovery team have been met and approval has been granted <br /> by cognizant organizations and agencies, the affected areas and facilities may be returned to <br /> normal operations, or operations relocated as necessary. <br /> 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.