Laserfiche WebLink
VNDIERGROUND STORAGE TANK <br /> - WOMTORINO SYSTEM CERTIFICATION FORM ( Page a of 6) , <br /> VIIL . MONITORING SYSTEM AND. PROGRAMMING <br /> This section must be completed if a monitoring panel Is used to perform leak detection monitoring. Y , N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® 0 El <br /> functionally tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their 0 ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? _ 0 ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? d ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the underAlspenser containment? E ❑ ❑ <br /> Dees the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically~ m ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a teak? ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? ❑ ❑ 0 <br /> For any answer oC '7V" above, describe ht section IX how and when these deficiencies were or will be corrected <br /> _ _._._ � IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> F@ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be aom feted if in-tank gauging is used to perform leak defection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? 01 ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Fpr any answer of "M' above, describe in section Xi how and when these deficiencies were or will be corrected <br /> XI. COMMENTS <br /> i <br /> 1 <br /> I <br /> s <br />