My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
2300 - Underground Storage Tank Program
>
PR0231463
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 11:03:57 AM
Creation date
4/19/2021 9:07:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231463
PE
2361
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
01
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PFF URDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> _ XII. _ LINE LEAK DETECTOR TESTING _ <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) w <br /> This section must be comnleted if LLDs are installed. Y. N NA <br /> Was a leak simulated to verity LLD performance? ® ❑ ❑ <br /> Check all that apply.) Simulated teak rate verified: _ ® 3 GPH ❑ 0. 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated ? 0 ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ 19 <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ 0 <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? W ® ❑ ❑ � <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? © El ❑ 1 <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? _ ❑ ❑ `� <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks?� �( ❑ ❑ <br /> { Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For anv answer of "N" above describe in section XUi Trow and when these issues were or will be corrected <br /> XIII . COMMENTS <br /> i <br /> } _ XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ® � Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring Is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure [I Hydrostatic <br /> � Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass <br /> _..__.._[ FailW <br /> �^ ❑ Pass ❑ Fail ❑ Pass Y — [J Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass El Fail [I Pass ❑ Fail <br /> El Pass _ ❑ Fail � T❑ Pass E3 Fail <br /> _ <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑_Pass _ ❑ Fail <br /> - M ❑ Pass_ ❑ Fail ❑ Pass ❑ Fail <br /> ❑ _Pass ❑ Fail ❑ Pass ❑_ Fail <br /> 0 Passy...w 0 Fail ❑ Pass ❑ Fail --- <br /> ❑ Pass ❑ Fail � ❑ Pass E3 Fail <br /> How was Interstitial communication verified? ❑ Simulated leak at far ends of the interstitial space. ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below) i <br /> For any answer of "FAIL" above, describe fn section XV how and when these Issues were or will be corrected. _ <br /> XV. COMMENTS <br /> T <br /> C <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.