Laserfiche WebLink
�J <br />The driller shall cover all uncompleted borings by leaving the drilling auger in the <br />boring at the end of the working day. A one -inch thick piece of plywood shall be <br />placed on top of the drilling auger as well. The drilling area will also be flagged with <br />warning tape <br />A boring log will be compiled during the drilling of the well and temporary borings. <br />3.1 Ground Water Wells <br />New ground water monitoring wells will be constructed per the construction drawings <br />and specifications. All well completion work will be completed in the presence of EHD <br />Unit 6 staff. <br />3.2 Temporary Boring <br />All temporary borings will be grouted with neat cement. Unless otherwise directed, all <br />temporary borings will be grouted in the presence of EHD Unit 6 staff. <br />The installation of the new ground water wells has been tentatively scheduled on <br />November 26th. The work may involve four to five days. After the first inspection, the <br />driller will notify EHD staff regarding the next inspection schedule on site. <br />Work Plan —Groundwater Monitoring Well Installation 5 San Joaquin County <br />Corral Hollow Sanitary Landfill Public Works/Solid Waste <br />