Page 2 of 4 <br /> 2. Nov 18th-24th <br /> a. Excavation of well Lateral trenches <br /> b. Installation of well lateral pipes <br /> c. Backfill of lateral trenches (Tentative) <br /> d. Lateral/Header connection(Tentative) <br /> 3. Nov 24th <br /> Drilling of the LFG wells will tentatively begin on November 24th. The drill rig crew may take <br /> two to four hours to drill a well. Well construction will begin immediately after drilling. <br /> 4. Nov 27th and Nov 28th. <br /> Thanksgiving holiday <br /> 5. Dec 9th <br /> Construction completion <br /> Inspection of all work will be coordinated with you per the project's work plan. The contractor <br /> has been notified regarding EHD's inspection schedule (9 am to 3.30 pm, M-F). <br /> Please let me know if you need any additional information. <br /> Thanks <br /> JOYESH J CHANDRA <br /> SAN JOAQUIN COUNTY <br /> DEPARTMENT OF PUBLIC WORKS <br /> SOLID WASTE DIVISION <br /> PH-(209)468-3066 <br /> FAX-(209)468-3078 <br /> From: Joyesh Chandra <br /> Sent: Friday, October 31, 2008 3:01 PM <br /> To: 'Natalia Subbotnikova [EH]' <br /> Cc: Michael Carroll; Robert McClellon; 'GYekta@CIWMB.ca.gov' <br /> Subject: RE: CHSL-LFG Ext Well Installation-Project <br /> Hello Natalia <br /> Attached,please find the amended work plan for the two additional Landfill Gas(LFG) extraction <br /> wells that we intent to include in our original LFG well installation project at Corral Hollow <br /> Landfill after your approval. <br /> Drilling permits for the two additional LFG wells and a hard copy of the amended work plan has <br /> been mailed to you. Please use the initial Service Request for the addition of the two new wells. <br /> If you need additional information,please let me know. <br /> Thanks <br /> 11/14/2008 <br />