My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 0 Page 1 of 4 <br />Natalia Subbotnikova [EH] <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Tuesday, November 18, 2008 5:27 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Carroll; Ifgc97@aol.com; Robert McClellon [EH] <br />Subject: RE: CHSL-LFG Ext Well Installation -Project Schedule <br />Hello Natalia <br />This email is to confirm the things that we had discussed today regarding the LFG well <br />installation project at Corral Hollow Landfill. <br />1. Our contractor will tentatively start drilling and installing the LFG wells on <br />December 04d 2008. The drilling and installation of all LFG wells will take about One <br />and half (1.5) working days; thus, the well installation task may end on Dec 3rd. I will re- <br />confirm again the drilling start with you two working days in advance before Dec 2nd. I <br />will call you at least 2 hours for inspection before the contractor will be installing the first <br />LFG well on Dec 2nd. The contractor has been notified regarding your inspection time <br />(9am -3:30 pm). <br />2. Solid waste Division can proceed with all well lateral excavation in the closure cap, <br />Lateral installation and Lateral trench backfill based on the approved work plan and <br />construction drawings without the presence of EHD. <br />3. Pictures and other minor notes will be taken by the Solid Waste Division staff during the <br />backfill of all lateral trenches in the closure cap. <br />If you need any additional information, please call me in the field at (916) 529-1940. <br />Thanks <br />JOYESH J CHANDRA <br />SAN JOAQUIN COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />SOLID WASTE DIVISION <br />PH -(209)468-3066 <br />FAX -(209)468-3078 <br />From: Joyesh Chandra <br />Sent: Wednesday, November 12, 2008 2:45 PM <br />To: 'Natalia Subbotnikova [EH]' <br />Cc: Robert McClellon; Michael Carroll; Jaime Perez; Billy Baier; 'Ifgc97@aol.com' <br />Subject: CHSL-LFG Ext Well Installation -Project Schedule <br />Hello Natalia <br />Thank you for faxing the approved well permit permits for the Landfill Gas (LFG) extraction well <br />installation project at our Corral Hollow Landfill. Per our phone conversation, Solid Waste <br />11/19/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.