My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 2.0 GENERAL REQUIREMENTS <br /> 2.' Meetings <br /> In order to facilitate construction, and to clearly define construction goals and <br /> activities, close coordination between the owner, design engineer(s), CQA organization, <br /> and Contractor is essential. To meet this objective, pre-construction and progress <br /> meetings will be held. <br /> 2.1.1 Pre-Construction Meeting <br /> Following bid award, a pre-construction meeting will be held at the site. The purpose <br /> of this meeting, attended by the owner, Contractor, design engineer(s), CQA <br /> organization, agencies, and others designated by the owner, will be to: <br /> ♦ Review the construction P <br /> drawings, specifications, CQA Plan, work area <br /> security, health and safety procedures, and related issues. <br /> ♦ Provide all parties with relevant project documents. <br /> ♦ Review responsibilities and qualifications of each party. <br /> ♦ Define lines of communication and authority. <br /> ♦ Establish reporting and documenting procedures. <br /> ♦ Review procedures for handling submittals. <br /> ♦ Review testing equipment and procedures. <br /> ♦ Review procedures for field directives and change orders. <br /> ♦ Establish testing protocols and procedures for correcting and documenting <br /> construction or non-conformance. <br /> ♦ Establish a weekly meeting schedule. <br /> ♦ Conduct a site inspection to discuss work areas, stockpile areas, lay down <br /> areas, access roads, haul roads, and related items. <br /> ♦ Review the project schedule and critical path items. <br /> ♦ Review the Contractor's work plan. <br /> The meeting will be documented by the CQA Officer. Copies of the minutes and <br /> relevant documents will be prepared and provided to all parties. <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valley, CA• (530) 272-2448 <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.