Laserfiche WebLink
Construction Quality Assurance( ) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> Procedure — A document that specifies or describes how an activity is to be <br /> P Y <br /> performed. <br /> Project Documents—Contractor submittals, construction drawings, record drawings, <br /> specifications, shop drawings,construction quality control and quality assurance plans, <br /> health and safety plan, and project schedule. <br /> Record Drawings — Drawing recording the constructed dimensions, details, and <br /> coordinates of the project. Also referred to as "as-builts." <br /> Testing — Verification that an item meets the specified requirements by subjecting <br /> that item to a set of physical, chemical, environmental, or operating conditions. <br /> Testing Laboratory—A"third—party" laboratory, independent from the Owner and <br /> operator, capable of conducting the tests required by this CQA Plan and the <br /> specifications. <br /> Vector Engineering, Inc. .143E Spring Hill Drive•Grass Valley, CA• (530)272-2448 <br /> -5- <br />