Laserfiche WebLink
Construction Quality Assurance A)Plan 46 Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 2.2 Responsibilities of Construction Quality Assurance Staff <br /> 2.2.1 Communications with the Contractor <br /> Only the individuals authorized by the Owner may communicate with the Contractor. <br /> Communications of an official nature must be clear, direct, and professional. When <br /> written communications are required, they must be documented on the appropriate <br /> forms. Formal letters to the Contractor will be issued by the Owner. <br /> 2.2.2 Communications with the Owner <br /> All communications must be through proper channels as defined in the project <br /> organization chart or as requested by the Owner. Communications of an official nature <br /> must be written, be clear, direct, and professional. <br /> 2.2.3 Qualifications of the Contractor <br /> The Contractor shall provide documentation regarding the experience of the company <br /> and work crew as specified in the specifications. <br /> 2.2.4 Responsibilities/Qualifications of the CQA Manager <br /> The CQA Manager administers the construction quality assurance program. CQA <br /> procedures and reports must be reviewed by the CQA Manager for compliance with the <br /> project CQA Plan. The CQA Manager acts as an auditor to verify and document the <br /> proper and complete implementation of the CQA program. The CQA Manger shall <br /> audit the project a minimum of three times during construction. The CQA Manager <br /> has authority to identify deficiencies and implement corrective action to the CQA <br /> program. The CQA Manager collects, distributes, and addresses disposition of <br /> Contractor submittals approved by the design engineer(s). The CQA Manager <br /> coordinates testing with independent testing laboratories and maintains record <br /> drawings. The CQA Manager reports directly to the construction manager. The CQA <br /> Manager will write the final construction report (FCR) under the direction of the CQA <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valley, CA• (530) 272-2448 <br /> -8- <br />