My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> Officer. The CQA Manager shall have completed a minimum of five years CQA <br /> experience for solid waste projects. <br /> 2.2.5 Responsibilities/Qualifications of the CQA Officer <br /> The CQA Officer is responsible for documenting and certifying that construction was <br /> performed in accordance with the intent of the design and the contract documents. The <br /> CQA Officer shall be a registered civil engineer or certified engineering geologist in the <br /> State of California. <br /> 2.2.6 Responsibilities of the Design Engineer(s) <br /> The design engineer(s) are responsible for site engineering services related to the <br /> design. At the request of the owner, his duties may include reviewing Contractor <br /> submittals, resolving technical issues related to construction,providing interpretation <br /> of the drawings and specifications, approving substantial design modifications and <br /> technical revisions. <br /> 2.2.7 Responsibilities/Qualifications of the CQA Monitors <br /> The CQA Monitors implement the CQA program under the direction of the CQA <br /> Manager. The CQA Monitors perform all construction monitoring and construction <br /> materials testing. The CQA Monitors maintain all documentation and test data <br /> summaries related to construction monitoring and construction materials testing.The <br /> CQA Monitors report directly to the CQA Manager. The CQA Monitor(s) shall have <br /> performed similar CQA activities on a minimum of three solid waste projects that <br /> involved earthworks and geosynthetic construction activities. <br /> r <br /> 2.3 Control of Documents, Records, and Forms <br /> 2.3.1 Project Control of Contract Documents <br /> Contract documents, including specifications, drawings, and change orders, are <br /> controlled by the construction manager. The construction manager maintains one or <br /> Vector Engineering, Inc. •143E Spring Hill Drive*Grass Valley, CA•(530)272-2448 <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.