My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aft <br /> Construction Quality Assurance(TA)Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> determined by additional sampling, testing, observations, review of records, or any <br /> other means deemed appropriate. <br /> 2.4.3 Documenting Non-Conformance <br /> All non-conformance must be documented in writing on the daily records, logs, and <br /> elsewhere, as appropriate. The documentation must occur immediately upon <br /> determining the extent of the non-conformance. For a non-conformance which is <br /> considered serious or complex in nature,or which requires an engineering evaluation, a <br /> Non-Conformance Report will be prepared and issued to the construction manager and <br /> Contractor. <br /> 2.4.4 Corrective Measures <br /> For a simple or routine non-conformance, corrective measures will be determined by <br /> specification direction, or if none exists, the construction manager, CQA Manager and <br /> Contractor will discuss standard construction methods to correct the deficiency. For <br /> Non-Conformance Reports, which require engineering evaluation,the design engineer <br /> must determine corrective measures. A copy of the Non-Conformance Report,with the <br /> design engineer's corrective measure determination, will be forwarded to the <br /> construction manager, CQA Manager, and Contractor for implementation of the <br /> corrective action. <br /> 2.4.5 Verification of Corrective Measures <br /> Upon notification by the Contractor that a corrective measure is complete, the CQA <br /> manager will verify its completion. The verification must be accomplished by <br /> observations or retesting and documented photographically. Written documentation of <br /> the corrective measures must be made by the CQA Manager on daily reports, logs, and <br /> forms, and, if applicable, the Non-Conformance Report. Verification of corrective <br /> measures will be reviewed by the CQA Officer. Corrective action measures that <br /> require an engineering evaluation will be reviewed and verified by the design engineer. <br /> Vector Engineering, Inc. .143E Spring Hill Drive•Grass Valley, CA• (530)272-2448 <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.