My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />The corrective action envisioned is based on the following: <br />1. The focus of the corrective action is source control. <br />2. The low level release of VOCs to groundwater will not require active groundwater cleanup <br />(pump and treat, air sparging, etc.). This approach is justifiable given the remoteness of <br />the landfill and absence of surrounding residences. <br />The performance objective of the corrective action is primarily to stop increases in VOC <br />concentrations in groundwater and secondarily to reduce VOC concentrations in groundwater over <br />time. <br />Corrective action taken to mitigate the hypothetical release scenario will include the following <br />activities: <br />1. Three additional LFG wells located to collect LFG from the deep waste and underlying <br />vadose zone. The wells will be 70 feet deep and screened at the soil/waste interface. The <br />location of the wells will be selected based on the location of the impact. <br />2. These wells will be connected to the existing LFG system. <br />Cost Analysis <br />The cost of the corrective action plan and the EMP includes engineering design, field <br />investigations, construction and associated materials, permitting, and final reports. Permitting <br />associated with the project will include RWQCB and SJC well drilling permits. <br />Costs are "contractor based", i.e., based on construction by contractor, not by County staff. The <br />cost for constructing the LFG components are based on a contractor bid received for similar work <br />at the Corral Hollow Landfill in June 2008. Costs for other components were escalated from the <br />original 2007 costs by applying the inflation factor supplied by the California Integrated Waste <br />Management Board. <br />The cost of construction is approximately $314,000. The annual cost over the 30 -year corrective <br />action period, including construction, operation and maintenance is estimated to be $28,000 <br />(Table 1). <br />Corrective Action Financial Assurance Cost Estimate 4 Public Works/Solid Waste Div. <br />Corral Hollow Sanitary Landfill September 30, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.