Laserfiche WebLink
SCOPE OF WORK—PHASE II WELL INSTALLATION <br /> JTF Stockton, 1819 South Argonaut Street,Stockton,California <br /> This scope of work details activities to be conducted by the drilling subcontractor at 1819 South <br /> Argonaut Street in Stockton, California, referred to as the Site. The Subcontractor shall install and <br /> develop six monitoring wells, five injection wells, and two extraction wells. Installations will be <br /> conducted using a roto-sonic drill rig. Field activities are currently scheduled as follows: <br /> • Well Installation: 6/16/2017 <br /> • Well Development:At least 2 days after final well installation <br /> • Start Time: 7:00 am (Pacific Time) <br /> Well Installation: <br /> • The surface at the site varies from asphalt to dirt. Please bring a coring device in case it is <br /> needed. <br /> • Continuously core borings using roto-sonic drilling method. <br /> • Decontaminate all downhole equipment between borings using a steam cleaner. <br /> • Water is not available at the site; a hydrant is located at the corner of Irene and South Argonaut <br /> Street. Please coordinate water access, whether getting a hydrant meter from the City of <br /> Stockton, or providing enough water for the scope of work. <br /> • Power is not available at the Site.Therefore, please include a generator, if necessary. <br /> V� • Soil IDW will be transferred to a soil roll-off bin stored in a central location at the site. Please <br /> (� bring a forklift with hopper. Forklift rental is available near Site at Holt Rental. <br /> 5 v • Non-silty water IDW can be transferred to on-Site storage tanks via pump. <br /> • The 6 proposed monitoring wells -3 shallow groundwater zone wells to approximately 30 ft bgs <br /> ' (MW-E, MW-F, and MW-G) and 3 deeper groundwater zone wells to approximately 80 ft bgs <br /> (MW-B, MW-C, and MW-D) will be constructed of 2-inch diameter Schedule (Sch)-40 PVC casing <br /> with Sch-40 PVC 0.010-inch slotted screen. <br /> • The 5 proposed deeper groundwater zone injection wells to 80 ft bgs (IW-B, IW-C, IW-D, IW-E, <br /> and IW-F) will be constructed of 2-inch diameter Sch-80 PVC casing and stainless steel wire- <br /> wrapped 0.02-inch slotted well screen. <br /> • The 2 proposed deeper groundwater zone extraction wells to approximately 80 ft bgs (EW-A and <br /> EW-B) will be constructed of 4-inch diameter Sch-80 PVC casing and stainless steel wire- <br /> wrapped 0.01-inch slotted well screen. A two foot sump will be installed beneath the well <br /> screen. <br /> • Well screens are anticipated to be 10 to 15 ft in length for monitoring wells, and 15 to 20 ft in <br /> length for injection and extraction wells. Please bring enough screen in case we decide to place <br /> up to 20 ft of screen at each monitoring location and 25 feet of screen at each injection and <br /> extraction location. <br /> • Total boring depths for shallow groundwater wells will be approximately 30 ft bgs, but please <br /> bring enough materials in the event that we would need to drill and install wells as deep as 45 ft <br /> bgs. <br /> • Total boring depths for deeper groundwater wells will be approximately 80 ft bgs, but please <br /> bring enough materials in the event that we would need to drill and install wells as deep as 100 <br /> ft bgs. <br /> • Drilling will be done in a telescoping fashion to case off the shallower sand zones, therefore, <br /> please bring the following: <br /> o At least 60 ft of 6-inch ID casing <br />