Laserfiche WebLink
Geosyntec Consultants <br /> Table 12 <br /> Proposed Well Construction Details <br /> Former John Taylor Fertilizers Co. <br /> Stockton,California <br /> Nominal Screen Interval <br /> EISB Well Depth Screen Filter <br /> Well Installation Diameter Top Bottom Length Pack <br /> ID Phase Ty 3einches ft b s (ft b s (fry ore uivalent) Casing Screen <br /> Shallow Groundwater Zone <br /> MW-E Phase 2 Monitoring ? I5 30 15 #2/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> MW-F Phase 2 Monitoring 15 30 I; 92/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> HIW-A Phase 2 Horizontal Injection I N1 NA' 400 NA' I IDPE 0.010-in HDPE <br /> Deeper Groundwater Zone <br /> MW-A Phase 1 Monitoring 70 85 15 #2/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> MW-B Phase 2 Monitoring _ 70 85 15 92/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> MW-C Phase 2 Monitoring 2 70 85 15 92/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> MW-D Phase 2 Monitoring 2 70 85 15 1#2/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> EW-A Phase 2 Extraction --&,y 70 85 15 TBDSch 80 PVC stainless steel wire wrapped' <br /> EW-13 Phase 2 Extraction 116, 4 70 85 15 TBD' Sch 80 PVC stainless steel wire wrapped 3 <br /> IW-A Phase 1 Vertical Injection 2 70 85 15 TBD' Sch 80 PVC stainless steel wire wrapped 3 <br /> IW-13 Phase 2 Vertical Injection 2 70 85 15 TBD' Sch 80 PVC stainless steel Wire wrapped 3 <br /> IW-C Phase 2 Vertical Injection 2 70 85 15 TBD' Sch 80 PVC stainless steel wire wrapped 3 <br /> IW-D Phase 2 Vertical Injection 2 70 85 15 TBD' Sch 80 PVC stainless steel Wire wrapped 3 <br /> IW-E Phase 2 Vertical Injection 2 70 85 15 TBD 3 Sch 80 PVC stainless steel Wire wrapped 3 <br /> IW-F Phase 2 Vertical Injection 1 2 1 70 85 15 TBD 3 Sch 80 PVC stainless steel wire wrapped' <br /> MW-G 2 15 30 15 #2/12 Sch 40 PVC 0.010-in Sch 40 PVC <br /> HDPE=High-density polyethylene <br /> in=inch MSL=Mean Sea Level i <br /> NA=Not applicable for the horizontal injection well <br /> Sch 40 PVC=Schedule 40 Polyvinyl Chloride JUN 16 2091?, <br /> TBD=to be determined v <br /> Notes: ENVIRpO+N,MENTAL HEALTH <br /> Proposed well construction details are subject to change based on field observations and conditions. PERMIT/SERVICES <br /> 1.Following well installation,each well will be given a sequential well number. <br /> 2.The horizontal injection well will be installed at a depth of approximately 24 ft bgs,within the center of the Shallow Target Area thickness. No filter pack will be installed,as this well will be installed via horizontal drilling <br /> technology. <br /> 3.Extraction and injection well filter pack and screen slot size will be determined based on results of aquifer material sieve analysis. <br /> 5/21/2015 <br /> P:kPmjects\Wilbur-Ellis\Wr025O(JTF)\STOCKTOMS2_Remediation\S2.B_TS,Well actor,RAW,&Dsn\Task 3_RAW\Tables\TBL12_PmposedWellSummary.xlsx 1 of 1 <br />