Laserfiche WebLink
1 <br />chlorinated aliphatic compounds using site-specific data to assess naturally -occurring <br />reductive dechlorination processes in the perched aquifer. The results of this analysis are <br />expected to support development of an Engineering Feasibility Study for Corrective Action. <br />The EMP report will be prepared to summarize the methods and results of the field and <br />laboratory investigations. It will build on the groundwater monitoring well installation <br />report (Section 3.4), including all of the information contained therein, as well as the <br />following: <br />• Aquifer test field methods, methods of data analysis, and results <br />• Groundwater sampling methods <br />• Soil.and liquid waste management <br />• Groundwater elevations, flow directions, gradients and velocities <br />• Groundwater chemistry data evaluation <br />• Assessment of migration pathways and fate of VOC impacts <br />The EMP report will be accompanied by tabulated groundwater chemistry data and figures <br />illustrating the locations of the existing and new groundwater monitoring wells, <br />groundwater equipotential contours, and isoconcentration contours. The EMP report will <br />be supported by appendices that contain the monitoring well permits, geologic logs, well <br />construction logs, well development field data, groundwater sampling field data, chain -of - <br />custody documentation, certified laboratory reports, aquifer testing graphical output, and <br />Biochlor modeling output. The final report will be signed by a California Professional <br />Geologist. <br />The report will be submitted first in draft form for County review, then in final form after <br />integration of County comments and edits. If the final draft is acceptable to the County, it <br />will be forwarded to the RWQCB for their review and comment, before it becomes finalized <br />for signature and is stamped. Prior to submittal of any work product to County, GLA will <br />provide comprehensive senior peer review of all deliverable technical documents. <br />4.0 ESTIMATED PROJECT SCHEDULE <br />Initial EMP work was conducted in a manner to meet the RWQCB schedule for submittal of <br />the Groundwater Monitoring Well Installation Report (December 15, 2011) and the EMP <br />Report (February 1, 2012). Samples from the temporary wells constructed during the initial <br />phase of work contained low-level, but measurable concentrations of VOCs that require the <br />construction of "step -out" wells to determine the extent of VOC impacts. The locations of <br />the step -out wells presented in this revised workplan required additional negotiations <br />between Caltrans and the County, requiring an extension to the overall project schedule. <br />15 <br />2011-0115 CHSL EMP Workplan Geo -Logic Associates <br />Revision 2 — January 11, 2012 <br />