I <br />The schedule for replacement well installation and subsequent EMP work is contingent <br />upon receipt of encroachment permits from Caltrans. Once the permits are received, the <br />County will provide a revised well construction and reporting schedule to the RWQCB. <br />5.0 CONCLUSION <br />This Workplan is based on the limited site information referenced herein. GLA should be <br />notified of any conditions that differ from those described herein since this may require a <br />re-evaluation of the data, conclusions, and work plans presented herein. This Workplan <br />was not prepared for use by other parties and projects other than those named or <br />described above. It may not contain sufficient information for parties or other purposes. <br />This Workplan was prepared in accordance with generally accepted geotechnical and <br />hydrogeologic practices, and makes no warranties, either expressed or implied, as to the <br />professional data presented in it. <br />Geo -Logic Associates <br />")�" �4� <br />John M. Hower, PG, CEG <br />Supervising Geologist <br />16 <br />2011-0115 CHSL EMP Workplan <br />Revision 2 —January 11, 2012 <br />Sarah J. Battelle, PG, CHG <br />Vice President <br />Geo -Logic Associates <br />