My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
1900 - Hazardous Materials Program
>
PR0521619
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 2:24:09 PM
Creation date
4/29/2021 2:11:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0521619
PE
1921
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 Actions or Circumstances Which Helped <br />Outline any administrative, operating, process or engineering controls which tended to mitigate the effects of the incident. Particularly in the case <br />of a near-miss, this would explain why the incident was controlled. Also include things that might have been done to minimize the effects of the <br />incident. <br />Incident was less serious than it could have been due to good inspection and maintenance practices. Total quantity released was 13lbs. <br />II. Affected Employees <br />List by name or job descriptions, all employees or contractors, whose work assignments were or could have been affected by the <br />release incident. <br />No injuries or evacuation occured. Tom reported the leak. Total quantity released was 13lbs. <br />III. Corrective And Preventive Recommendations <br />Recommendation Disposition Due Date Completed Person Responsible <br />Replace bad bottom isolation valve on HPR Sight <br />Column, Replace all Sight Glasses and Gaskets. This <br />is scheduled to take max 12 hours from start to <br />finish. 4am start. No impact to freezer temperatures <br />anticipated. See attached Repair Proposal <br />4/29/2021 Prokes, Tom <br />IV. References / Documents <br />Title Date Added Added By Include In Print <br />HPR Sight Column Repair Proposal 4/19/2021 Despain, Kayla <br />ServiceReport_WorkOrder_66635_DateTime_2021 <br />0413135952 (1) <br />4/19/2021 Despain, Kayla <br />Incident Investigation Calculation 4/23/2021 Silva, Dennis
The URL can be used to link to this page
Your browser does not support the video tag.