5. GDS shall pay their proportionate share of the cost for the design and construction of Class 1V <br /> Bike facility along the project site's frontage, in conformance with the City of Stockton Bicycle <br /> Master Man. <br /> 5. All utilities shall be underground. No structure shall be installed within the Public Utility <br /> Easement, except when authorized by the applicable utility company. <br /> Public Works Department&ontact_Eric Alvarez City Engineer at eric.alvarez[cr7,stocktonca.ctov <br /> 7. Developer and/or County shall pay their fair share for signal grant projects at Gionecchini and <br /> Pock intersections. <br /> B. County will need to enter into an operational and maintenance agreement for the signal and <br /> roadway at Arch-Airport Road and Giannecchini Lane. Plan check fees for improvements except <br /> utilities shall be required in accordance with the annexation agreement, <br /> 9. CDS shall coordinate the project with the City's signal installation projects (CMAC project). A <br /> technical memorandum for traffic circulation and operational analysis for the interim and ultimate <br /> plan of the project shall be developed and coordinated with the City of Stockton Public Works <br /> traffic division for approval. Such technical memorandum shall be submitted to the City of <br /> Stockton Community Development Department for review. <br /> 10. All costs for redesigning the signal project at Arch AiiportlGiannechenni Ln to include <br /> Giannechenni Ln access to the south will be the ODS' responsibility. <br /> 11. Any new and amended "interim" traffic treatments during construction of the development <br /> frontage relevant the intersections of 8 St, Pock Ln, and Giannechinn+ with Arch Ariport will be <br /> reviewed and approved by the City. <br /> Fire De artment� Contact Phil Simon, Assistant Fire Marshal at hil.sirnon stocktonca. av <br /> 12. Public fire hydrants will be required on the south frontage of Arch-Airport Way as part of the <br /> frontage improvements. Public fire hydrant spacing shall be not more than 300-feet apart <br /> 13. A water line extension and fire hydrants will be required on the Pock Lane portion of the <br /> project. <br /> 14. A second point of connection is required for the on-site water line loop that is serving the <br /> property. Preferably, the second point of connection should come from the Pock Lane water line <br /> extension. <br /> 15. Need to confirm how the fire sprinkler service lines will come into the property from. <br /> Page 2 of 3 <br />