My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014102
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
2750
>
2600 - Land Use Program
>
PA-2100059
>
SU0014102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 8:15:37 AM
Creation date
5/3/2021 4:42:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014102
PE
2635
FACILITY_NAME
PA-2100059
STREET_NUMBER
2750
Direction
E
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
APN
17726010, -14
ENTERED_DATE
4/27/2021 12:00:00 AM
SITE_LOCATION
2750 E ARCH RD
RECEIVED_DATE
4/26/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. GDS shall pay their proportionate share of the cost for the design and construction of Class 1V <br /> Bike facility along the project site's frontage, in conformance with the City of Stockton Bicycle <br /> Master Man. <br /> 5. All utilities shall be underground. No structure shall be installed within the Public Utility <br /> Easement, except when authorized by the applicable utility company. <br /> Public Works Department&ontact_Eric Alvarez City Engineer at eric.alvarez[cr7,stocktonca.ctov <br /> 7. Developer and/or County shall pay their fair share for signal grant projects at Gionecchini and <br /> Pock intersections. <br /> B. County will need to enter into an operational and maintenance agreement for the signal and <br /> roadway at Arch-Airport Road and Giannecchini Lane. Plan check fees for improvements except <br /> utilities shall be required in accordance with the annexation agreement, <br /> 9. CDS shall coordinate the project with the City's signal installation projects (CMAC project). A <br /> technical memorandum for traffic circulation and operational analysis for the interim and ultimate <br /> plan of the project shall be developed and coordinated with the City of Stockton Public Works <br /> traffic division for approval. Such technical memorandum shall be submitted to the City of <br /> Stockton Community Development Department for review. <br /> 10. All costs for redesigning the signal project at Arch AiiportlGiannechenni Ln to include <br /> Giannechenni Ln access to the south will be the ODS' responsibility. <br /> 11. Any new and amended "interim" traffic treatments during construction of the development <br /> frontage relevant the intersections of 8 St, Pock Ln, and Giannechinn+ with Arch Ariport will be <br /> reviewed and approved by the City. <br /> Fire De artment� Contact Phil Simon, Assistant Fire Marshal at hil.sirnon stocktonca. av <br /> 12. Public fire hydrants will be required on the south frontage of Arch-Airport Way as part of the <br /> frontage improvements. Public fire hydrant spacing shall be not more than 300-feet apart <br /> 13. A water line extension and fire hydrants will be required on the Pock Lane portion of the <br /> project. <br /> 14. A second point of connection is required for the on-site water line loop that is serving the <br /> property. Preferably, the second point of connection should come from the Pock Lane water line <br /> extension. <br /> 15. Need to confirm how the fire sprinkler service lines will come into the property from. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.