My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Defective design Faulty or <br />Deterioration and or physical inadequate Hazardous <br />Building # Dilapidation construction infrastructure Contamination <br />718 <br />21 <br />81 V. <br />91 V. <br />51 V. <br />60 V. <br />70 V. <br />80 V. <br />81 V. <br />91 V. <br />116 <br />120 V. <br />Subtotal 35 62 20 15 <br />Source: RSG Field Survey and Environmental Data Resources, Inc. <br />Defective Design <br />A parcel and/or building suffers from defective design when the setbacks do <br />not comply with the current municipal requirements; there is a lack of parking; <br />ingress and egress are difficult for vehicular traffic; structures lack sufficient <br />loading and unloading spaces; or buildings are used for purposes for which it <br />was not originally built for. <br />The field survey conducted by RSG reveals that 62 (43%) of the 143 <br />buildings suffer from defective design. The most common forms of defective <br />design noted during the field survey were lack of adequate loading and <br />unloading spaces and lack of proper ingress and egress of vehicles around <br />structures. According to Jeff Casper, Property Manager for the Port, the <br />spaces between the storage/warehouse buildings are inadequate for truck <br />movement. Also, the Development Plan identifies exterior wall damage in the <br />warehouses from forklift and cargo impact due to inadequate movement and <br />loading and unloading space. <br />As mentioned previously in this Report, most of the buildings were <br />constructed in the mid to late 1940's for storage and transit of war materials, <br />and these buildings are currently being used for storage and warehousing. <br />These structures are not designed for modern day commercial storage and <br />warehousing. The buildings need to be upgraded from time to time to keep <br />up with the changing demands of the industry. The buildings in the Project <br />Area have not been upgraded and also, several of them suffer from severe <br />deterioration and dilapidation. As a result of these factors, there is a high <br />vacancy rate and lease rates remain low. <br />ROSENOW SPEVACEK GROUP, INC. REDEVELOPMENT AGENCY OF THE CITY OF STOCKTON <br />MAY 3, 2004 <br /> ROUGH AND READY ISLAND REDEVELOPMENT PROJECT <br />- B-8 - PRELIMINARY REPORT
The URL can be used to link to this page
Your browser does not support the video tag.