My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING AND REP -ING PROGRAM ORDER NO. R5-2008-r -c -2- <br />HJ BAKER & BRO. INC., MARTIN C,. tATING PARTNERSHIP, THE PORT a DCKTON, <br />AND METROPOLITAN STEVEDORE <br />MOLTEN SULFUR PROCESSING PLANTS <br />SAN JOAQUIN COUNTY <br />All monitoring samples must be representative of the volume, nature, or matrix of material <br />sampled. The time, date, and location of each sample must be recorded on the sample chain- <br />of-custody form. If methods other than U.S. EPA-approved methods or Standard Methods for <br />the Examination of Water and Wastewater, latest edition, are used, the exact methodology must <br />be submitted for review and approval. All monitoring points must be sampled and analyzed for <br />parameters and constituents of concern as indicated and listed herein. All monitoring results <br />must be reported and all relevant facts must be fully disclosed. <br />Martin's Facility-Specific Monitoring <br />Martin's prill stockpiles generate sulfur-contact water. The sulfur-contact water drains acr <br />the floor of the stockpile area to drainage ditches, then to a sump with a sump pump, and fi <br />to a 481,000-gallon above-ground storage tank (AST). Martin recycles its sulfur-contact wat <br />through its pulling process. This revised MRP requires that Martin monitor and report the su <br />contact-water constituent concentrations in its 481,000-gallon AST. Table 1 contains the <br />monitoring frequency and parameters for Martin's facility-specific monitoring. Results must b <br />documented in reports due by the Reporting Due Date shown in Table A. <br />Table 1 <br />Martin's Facility-Specific Monitoring of Its AST Sulfur Contact—Water <br />Field Parameters <br />Temperature <br />Specific Conductance <br />pH <br />Units <br />00 <br />umhos/cm <br />SU <br />Monitoring Frequency <br />January and July <br />January and July <br />January and July <br />Monitoring Parameters <br />Sulfur, total (EPA 200.7) <br /> mg/L <br />Total Dissolved Solids (EPA 160.1) <br /> mg/L <br />Sulfate (EPA 300 Series) <br /> mg/L <br />Major Anions (See Table 6) mg/L <br />Major Cations (See Table 6) mg/L <br />January and July <br />January and July <br />January and July <br />January <br />January
The URL can be used to link to this page
Your browser does not support the video tag.