My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED MONITORING AND REP' -ING PROGRAM ORDER NO. R5-2008-r"c <br />HJ BAKER & BRO. INC., MARTIN 0, :ATING PARTNERSHIP, THE PORT 01 )CKTON, <br />AND METROPOLITAN STEVEDORE <br />MOLTEN SULFUR PROCESSING PLANTS <br />SAN JOAQUIN COUNTY <br />-3- <br />Baker's Facility—Specific Monitoring <br />Baker stockpiles its prill outside and exposed to the environment. When exposed to rain and/or <br />moisture, the stockpiles generate sulfur-contact water that drains across the floor of the <br />stockpile area and into a collection system. The collection system consists of lined sumps with <br />sump pumps, conveyance pipe, and a 500,000-gallon AST. Baker recycles its sulfur-contact <br />water through its pulling process. <br />This revised MRP requires that Baker monitor its sulfur-contact water at a location that is <br />representative of the sulfur-contact water generated by the prill stockpiles that are located 0 <br />the sulfur storage area (i.e., referred to by Baker as its "clay pit"). <br />Table 2 contains Baker's monitoring parameters and frequencies for sampling the sulfur-con <br />water. Baker must report its results twice per year according to the Reporting Due Dates <br />shown in Table A of Section A of this revised MRP. <br />Table 2 <br />Baker's Facility-Specific Monitoring of Its Sulfur Contact-Water <br />Field Parameters <br />Temperature <br />Specific Conductance <br />pH <br />Monitoring Parameters <br />Sulfur, total (EPA 200.7) <br />Total Dissolved Solids (EPA 160.1) <br />Sulfate (EPA 300 Series) <br />Major Anions (See Table 6) <br />Major Cations (See Table 6) <br />Units <br />°C <br />umhos/cm <br />SU <br />mg/L <br />mg/L <br />mg/L <br />mg/L <br />mg/L <br />Monitoring Frequency <br />January and July <br />January and July <br />January and July <br />January and July <br />January and July <br />January and July <br />January <br />January <br />ci
The URL can be used to link to this page
Your browser does not support the video tag.