My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Development Plan also suggests that miscellaneous buildings including <br />various offices, equipment maintenance buildings of various sizes and <br />construction types, a bowling alley, a gymnasium and a swimming pool may <br />be demolished, as they are not suitable for Port industrial use. <br />The combination of the deficiencies discussed earlier in this Report prevents <br />the Project Area from functioning efficiently as a port facility. Due to the <br />insufficiencies and the extraordinary cost to improve these buildings for <br />modern operations, approximately $30 to $40 per square foot, buildings must <br />be demolished to make room for modern port or other commercial <br />transportation operations. <br />It is also important to note that most of the buildings in the Project Area were <br />likely to be constructed with hazardous materials or contaminants that were <br />not known to be dangerous materials at the time these buildings were <br />constructed, but are known to be dangerous today. The fact that the cost to <br />improve, rehabilitate, and upgrade these structures out-weighs the cost to <br />demolish these buildings casts considerable doubt on any degree of reuse <br />potential for these structures. <br />Buildings that, When Built, Did Not Conform to the Then Effective Building, <br />Plumbing, Mechanical, or Electrical Codes Adopted by the Community Where the <br />Project Area is Located <br />Evidence of the non-conformance of structures in the Project Area to building <br />codes in existence when the structures were built is not readily determinable <br />from the field survey or the data received from City staff at this time. <br />However, because buildings in the Project Area were located on land <br />designated for military use, construction of buildings in the Project Area were <br />not subject to conformance with local building, plumbing, mechanical or <br />electric codes. Therefore, it is reasonable to assert that these structures did <br />not conform to local codes when built, and remain in non-compliance with <br />applicable codes. <br />Properties Included for Redevelopment Purposes <br />The proposed Project Area is composed of a single parcel, which is blighted, <br />as discussed previously in this section of the Report, and no other non- <br />blighted properties are included for effective redevelopment. <br />ROSENOW SPEVACEK GROUP, INC. REDEVELOPMENT AGENCY OF THE CITY OF STOCKTON <br />MAY 3, 2004 <br />ROUGH AND READY ISLAND REDEVELOPMENT PROJECT <br />- B-26 - PRELIMINARY REPORT
The URL can be used to link to this page
Your browser does not support the video tag.