Laserfiche WebLink
Retention basin <br />Discharge pipe to <br />the retention basin <br />New BMP roof/cover over Conveyor 10 <br />tropolitan Stevedore, San Joaquin )unty <br />5 March 2009 Inspection <br />Photograph 3: New asphalt pavement installed over bare earth at <br />Area 3. Run-off from Area 3 discharges to the retention pond through <br />the pipe shown in Photograph 4. <br />Photograph 4: The cover over Conveyor 10 will help prevent storm <br />water from contacting prill residue in the conveyor belt. Run off from this <br />conveyor discharges to the retention pond.