My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arnold <br />Schwarzenegger <br />Governor <br />California <br />Linda S. Adams <br />Secretary for <br />Environmental <br />Protection <br />26 March 2009 <br />Jeff Kasper, Deputy Director <br />Port of Stockton <br />P.O. Box 2089 <br />Stockton, CA 95201-2089 <br />egional Water Quality Cor "~ol Board <br />Central Valley Region <br />Karl E. Longley, ScD, P.E., Chair <br />Phone (916) 464-3291 • FAX (916) 464-4645 <br /> EIVE <br />http://vvww.waterboards.ca.govicentralvalley <br />MAR 0 2009 <br />Steven Arnett, Plant Manager - <br />ENVIRONMENT HEALTH PERMIPSERVICPS <br />Martin Operating Partnership <br />P.O. Box 982 <br />Stockton, CA 95201-0982 <br />I <br />11020 Sun Center Drive #200, Rancho Cordova, Cdifornia 95670-6a-4j <br />Chuck DeJong, Plant Manager Captain Leif Gistrand <br />H.J. Baker & Bro. Inc. Metropolitan Stevedore Company <br />P.O. Box 2089 <br /> <br />Pier 35 <br />Stockton, CA 95201 <br /> <br />San Francisco, CA 94133 <br />REVIEW OF FINAL MONITORING WELL INSTALLATION WORK PLAN—BULK TERMINAL <br />SITES, PORT OF STOCKTON, SAN JOAQUIN COUNTY <br />The Central Valley Regional Water Quality Control Board (Board) staff has reviewed the final <br />Monitoring Well Installation Work Plan—Bulk Terminal Sites (Work Plan) received from the Port <br />of Stockton, Martin Operating Partnership, HJ Baker, and Metropolitan Stevedore <br />(Dischargers) on 17 February 2009. The Dischargers are regulated under Monitoring and <br />Reporting Program R5-2008-0825 (MRP), and submittal of the work plan was a requirement of <br />Section A of the MRP. <br />Based on staffs review, the final Work Plan is complete and it incorporated all of the <br />comments from staffs 14 January 2009 review letter of the draft Work Plan. <br />Staff looks forward to working with the Dischargers on this project. Should you have <br />questions, please contact me at mboydwaterboards.ca.qov or (916) 464-4676. <br />Mary Boyd <br />Water Resource Control Engineer <br />Compliance and Enforcement <br />Title 27 and Non 15 Programs <br />cc: Harlin Knoll, San Joaquin County Dept. of Environmental Health, Stockton <br />Peter Weiler, ERS Corporation, Walnut Creek <br />Bill Jennings, California Sporting-Fishing Protection Alliance, Stockton <br />Ken Berry, California Citizens for Environmental Justice, Jackson <br />MLB/VV\San Joaquin/ ....Review of Group Final MVVInstallation Plan.doc <br />California Environmental Protection Agency <br />Recycled Paper
The URL can be used to link to this page
Your browser does not support the video tag.