Laserfiche WebLink
CLEANUP AND ABATEMENT OM_ < NO R5-2008-0707 -7- <br />MARTIN OPERATING PARTNERSHIP AND THE PORT OF STOCKTON <br />MOLTEN SULFUR PROCESSING PLANT <br />SAN JOAQUIN COUNTY <br />swales, ditches, and piping. The surface area of the prill stockpile and sulfur-contact <br />areas shall be included. A hard copy (11"x17") and electronic format (i.e., PDF) file <br />shall be submitted. <br />A 12-month water balance with the local monthly mean precipitation (based on a <br />100-year precipitation event), inflow, storage capacity, outflow, evaporation, and <br />rainfall from a 100-year 24-hour event storm event. Inflow shall include drainage <br />from the sulfur-contact surface areas, leachate, process water, make-up water, any <br />leachate that enter sumps, and any other liquid that enters the process. The source <br />and monthly usage of supply water shall be included in the water balance. <br />An Operations and Maintenance Plan (O&M Plan) for any part of this facility that <br />stores sulfur, stores or conveys leachate or liquids that have come in contact with <br />sulfur, and for any structure that is designed to contain the sulfur, leachate, and prill. <br />The O&M Plan shall contain a list of all sumps, ditches, swales, above ground <br />storage tank (ASTs), and piping that contain or convey sulfur contact-water or <br />leachate. The O&M Plan shall contain a copy of the comprehensive site map <br />(described above). At a minimum, the O&M Plan shall contain a routine schedule, <br />procedures, and logbooks or forms to document work, as follows: <br />The annual inspection and leak detection tests, repairs, and retests for the <br />AST, all sumps, and leachate conveyance systems. <br />Logbook (or similar) to record the leak detection test results. <br />Logbook (or similar) to schedule and perform repairs on any equipment that <br />failed the leak detection test. <br />Measures to prevent prill from discharging outside the prill storage area, <br />including measures to prevent the discharge of prill off of the overhead <br />conveyor (that dumps prill onto the stockpiles). <br />Measures to prevent the formation of ponded surface water (with a pH less <br />than 6.5 SU or greater than 8.5 SU) outside the prill storage area. <br />3. By 31 January 2009, the Discharger shall submit the following: <br />Certification that a new wall to match the existing east wall has been installed on <br />the east side of the stockpile area. <br />Certification that the below grade vaults, sumps, and basins have been epoxy- <br />coated. <br />Certification that the leachate sumps and leachate conveyance system have <br />passed any leak detection tests. <br />Verification that poles and additional windscreens have been installed around the <br />entire perimeter of the prill storage area. <br />Certification that stockpiles do not, and will not at any time in the future, extend <br />above the upper limits of the windscreens. The certification must include the