My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT OM_ < NO R5-2008-0707 -7- <br />MARTIN OPERATING PARTNERSHIP AND THE PORT OF STOCKTON <br />MOLTEN SULFUR PROCESSING PLANT <br />SAN JOAQUIN COUNTY <br />swales, ditches, and piping. The surface area of the prill stockpile and sulfur-contact <br />areas shall be included. A hard copy (11"x17") and electronic format (i.e., PDF) file <br />shall be submitted. <br />A 12-month water balance with the local monthly mean precipitation (based on a <br />100-year precipitation event), inflow, storage capacity, outflow, evaporation, and <br />rainfall from a 100-year 24-hour event storm event. Inflow shall include drainage <br />from the sulfur-contact surface areas, leachate, process water, make-up water, any <br />leachate that enter sumps, and any other liquid that enters the process. The source <br />and monthly usage of supply water shall be included in the water balance. <br />An Operations and Maintenance Plan (O&M Plan) for any part of this facility that <br />stores sulfur, stores or conveys leachate or liquids that have come in contact with <br />sulfur, and for any structure that is designed to contain the sulfur, leachate, and prill. <br />The O&M Plan shall contain a list of all sumps, ditches, swales, above ground <br />storage tank (ASTs), and piping that contain or convey sulfur contact-water or <br />leachate. The O&M Plan shall contain a copy of the comprehensive site map <br />(described above). At a minimum, the O&M Plan shall contain a routine schedule, <br />procedures, and logbooks or forms to document work, as follows: <br />The annual inspection and leak detection tests, repairs, and retests for the <br />AST, all sumps, and leachate conveyance systems. <br />Logbook (or similar) to record the leak detection test results. <br />Logbook (or similar) to schedule and perform repairs on any equipment that <br />failed the leak detection test. <br />Measures to prevent prill from discharging outside the prill storage area, <br />including measures to prevent the discharge of prill off of the overhead <br />conveyor (that dumps prill onto the stockpiles). <br />Measures to prevent the formation of ponded surface water (with a pH less <br />than 6.5 SU or greater than 8.5 SU) outside the prill storage area. <br />3. By 31 January 2009, the Discharger shall submit the following: <br />Certification that a new wall to match the existing east wall has been installed on <br />the east side of the stockpile area. <br />Certification that the below grade vaults, sumps, and basins have been epoxy- <br />coated. <br />Certification that the leachate sumps and leachate conveyance system have <br />passed any leak detection tests. <br />Verification that poles and additional windscreens have been installed around the <br />entire perimeter of the prill storage area. <br />Certification that stockpiles do not, and will not at any time in the future, extend <br />above the upper limits of the windscreens. The certification must include the
The URL can be used to link to this page
Your browser does not support the video tag.