My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT 0, R NO R5-2008-0707 -8- <br />MARTIN OPERATING PARTNERSHIP AND THE PORT OF STOCKTON <br />MOLTEN SULFUR PROCESSING PLANT <br />SAN JOAQUIN COUNTY <br />maximum height of stockpiles and maximum height of windscreens. Additionally, <br />the Discharger must maintain the stockpiles below that maximum value. <br />f. Alternatively, the Discharger may submit a technical engineering report certifying <br />that the windscreen height and extent, the dropping of prill from the conveyor onto <br />stockpiles, and the windscreen material, locations, and gaps will prevent <br />windblown sulfur and drift from leaving the pull storage area. The report must <br />provide the height of the sulfur stockpiles and the height of the conveyor above <br />which wind drift may occur. The Discharger must maintain the piles below that <br />value. The report must be prepared under the direct supervision of a California <br />Registered Civil Engineer and must be signed and stamped by the registered <br />professional. <br />4. By 31 March 2009, the Discharger shall submit a report certifying continuous and <br />uninterrupted operation of the 481,000-gallon concrete AST has commenced; that the <br />two Hypalon-lined ponds have been removed from service and the area has been <br />backfilled; that pavement at the "bone yard" has been installed; and that pavement from <br />the south end of the storage yard to the entrance road has been installed. <br />In accordance with California Business and Professions Code Sections 6735, 7835, and <br />7835.1, engineering and geologic evaluations and judgments shall be performed by or under <br />the direction of registered professionals competent and proficient in the fields pertinent to the <br />required activities. All technical reports specified herein that contain workplans for, that <br />describe the conduct of investigations and studies, or that contain technical conclusions and <br />recommendations concerning engineering and geology shall be prepared by or under the <br />direction of appropriately qualified professional(s), even if not explicitly stated. Each technical <br />report submitted by the Discharger shall contain the professional's signature and stamp of the <br />seal.
The URL can be used to link to this page
Your browser does not support the video tag.