Laserfiche WebLink
William Little <br /> California Professional Geologist#7473 <br /> Advanced GeoEnvironmental, Inc. <br /> Environmental • Industrial Hygiene • Geotechnical • Contracting <br /> Phone: 800-511-9300 <br /> Fax: 888-445-8786 <br /> wlittle advgeoenv.com <br /> www.advgeoenv.com <br /> This email/fax message is for the sole use of the intended recipient(s) and may contain confidential <br /> and privileged information. Any unauthorized review, use, disclosure or distribution of this email/fax is <br /> prohibited. If you are not the intended recipient, please contact the sender by email/fax and destroy <br /> all paper and electronic copies of the original message. <br /> From: Harprit S. Mattu [EH] [mailto:hmattu0bsjcehd.com] <br /> Sent: Monday, March 23, 2015 4:31 PM <br /> To: William Little <br /> Cc: Robert McClellon [EH] <br /> Subject: AGE Workplan 500 E. Louise Ave <br /> Importance: High <br /> Hi Bill, <br /> I have reviewed your site investigation work plan for 500 E. Louise Avenue and wanted to bring a few issues to your <br /> attention: <br /> Health and Safety Plan <br /> -The health safety plan is not completely filled out. <br /> -All personnel onsite during the investigation must have 40 Hour HAZWOPER Certification and this must be mentioned in <br /> the health and safety plan. <br /> -Under section 5.0. Levels of protection are not specified. <br /> -Under section 6.0, Project Team Leader responsibilities are left blank. <br /> -Under section 9.0, intervals are not specified for the monitoring instruments. <br /> -Under section 9.0 names of appropriate staff are not filled in. <br /> -Under section 2.0 names of appropriate staff are not filled in. <br /> Investigation Work Plan <br /> -Under section 2.2 of the work plan you stated "if no more than 1 cubic yard of waste is encountered,then then <br /> excavations spoil waste will be considered de minimus." <br /> -Please explain what you mean by this statement, specifically the term "excavation spoil waste." <br /> -Note that if waste is excavated from the site, it cannot be back filled, it must be disposed of at a permitted <br /> disposal facility. You will need to state in your workplan how you plan to handle any hazardous waste in <br /> addition to solid waste that you encounter during the excavation. <br /> -Under section 2.5 you stated that waste will be stored on-site and disposal alternatives will be evaluated based on soil <br /> and water analysis results. <br /> -Are you referring to analysis of the soil samples collected during the investigation, or is this referring to analysis <br /> of the waste removed from the site during the excavation? Please clarify. <br /> -Excavated waste will need to be tested to determine proper location for final disposal. <br /> If any other issues arise I will let you know as soon as possible. <br /> 3 <br />