Laserfiche WebLink
Additionally, AGE attempted torifY the scope of waste disposal w0in the workplan. Previous <br /> inspections might have depicted glass waste, however, analysis of the subsurface soil column (the <br /> report was attached and provided to your office for review) did not indicate a considerable volume <br /> (vertically) of waste glass debris; glass waste and random waste which is not glass rather trash or <br /> deconstruction refuse from the factory, will be disposed at a landfill. Additionally, there were no <br /> concentrations of chemicals which could be characterized as hazardous waste. However, samples <br /> will be collected (stockpiled waste is appropriated detected) to verify the findings of this proposed <br /> trenching examination and reconnaissance. <br /> Attached are the two documents for the project. AGE would be planning to schedule this investigation <br /> within the next three weeks. Please call me if you have any questions. <br /> William Little <br /> California Professional Geologist#7473 <br /> Advanced GeoEnvironmental, Inc. <br /> Environmental • Industrial Hygiene • Geotechnical • Contracting <br /> Phone: 800-511-9300 <br /> Fax: 888-445-8786 <br /> wlittle@advgeoenv.com <br /> www.advgeoenv.com <br /> This email/fax message is for the sole use of the intended recipient(s) and may contain confidential <br /> and privileged information. Any unauthorized review, use, disclosure or distribution of this email/fax is <br /> prohibited. If you are not the intended recipient, please contact the sender by email/fax and destroy <br /> all paper and electronic copies of the original message. <br /> From: Harprit S. Mattu [EH] [mailto:hmattu(Gbsjcehd.com] <br /> Sent: Monday, March 23, 2015 4:31 PM <br /> To: William Little <br /> Cc: Robert McClellon [EH] <br /> Subject: AGE Workplan 500 E. Louise Ave <br /> Importance: High <br /> Hi Bill, <br /> I have reviewed your site investigation work plan for 500 E. Louise Avenue and wanted to bring a few issues to your <br /> attention: <br /> Health and Safety Plan <br /> -The health safety plan is not completely filled out. <br /> -All personnel onsite during the investigation must have 40 Hour HAZWOPER Certification and this must be mentioned in <br /> the health and safety plan. <br /> -Under section 5.0, Levels of protection are not specified. <br /> -Under section 6.0, Project Team Leader responsibilities are left blank. <br /> -Under section 9.0, intervals are not specified for the monitoring instruments. <br /> -Under section 9.0 names of appropriate staff are not filled in. <br /> -Under section 2.0 names of appropriate staff are not filled in. <br /> Investigation Work Plan <br /> 4 <br />