My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1992-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:34:37 PM
Creation date
5/7/2021 8:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1993
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA Pete Wilson,Governor <br /> CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD <br /> 8800 Cat Center Drive <br /> Sacramento,California 95826 .� <br /> RFCF-IVED <br /> October 13 , 1992 <br /> Mr. Thomas Horton INVIRONMENTAL HEALTH <br /> Solid Waste Manager <br /> San Joaquin County Public Works <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> Subject: Summary of Outstanding Requirements for Closure and <br /> Postclosure Maintenance Plans, Harney Lane Sanitary <br /> Landfill, SanJoaquinCounty, Facility No. 39-AA-0003 <br /> Dear Mr. Horton: <br /> The following summary of the September 4, 1992, meeting between <br /> the California Integrated Waste Management Board (Board) , the <br /> Central Valley Regional Water Quality Control Board (Regional <br /> Water Board) and San Joaquin County Public Health Service (LEA) <br /> staff and representatives from San Joaquin County Department of <br /> Public Works, is intended to serve as a guide to supplement the <br /> above referenced regulatory agencies' comments regarding the <br /> final closure and postclosure maintenance plans for Harney Lane <br /> Sanitary Landfill (Landfill) . Your response to the summarized <br /> comments must be integrated into the final closure and <br /> postclosure maintenance plans as applicable. <br /> 1. It is the understanding of the Board that the owner of the <br /> landfill will be acquiring an engineering firm to design and <br /> cost a landfill gas collection and control system within the <br /> next several weeks. <br /> 2 . A county geologist, Mr. Michael Selling, will be on site at <br /> all times during the excavation, mixing, and construction of <br /> the final cover. The name and a brief resume of the <br /> geologist is to be included in the closure plan Construction <br /> Quality Assurance Manual (CQAM) . <br /> 3 . The County will perform all surveying activities and prepare <br /> maps based upon the survey. <br /> 4. Kleinfelder is the designated Construction Quality Assurance <br /> Officer, and that Kleinfelder will certify the final cover, <br /> pursuant to Title 14, California Code of Regulations (14 <br /> CCR) , Division 7, Chapter 3 , Article 7. 8, Section 17774 . <br /> 5. The engineer of record is responsible for maintaining the <br /> construction quality assurance of the foundation layer and <br /> the barrier layer. The engineer of record, Mr. Gabriel <br /> Karam, will write a letter certifying the entire final cover <br /> assembly once the final cover has been installed and has met <br /> all requirements for operation and CQA. <br /> Printed on Recycled Paper— <br />
The URL can be used to link to this page
Your browser does not support the video tag.