Laserfiche WebLink
STATE OF CALIFORNIA Pete Wilson,Governor <br /> CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD <br /> 8800 Cat Center Drive <br /> Sacramento,California 95826 .� <br /> RFCF-IVED <br /> October 13 , 1992 <br /> Mr. Thomas Horton INVIRONMENTAL HEALTH <br /> Solid Waste Manager <br /> San Joaquin County Public Works <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> Subject: Summary of Outstanding Requirements for Closure and <br /> Postclosure Maintenance Plans, Harney Lane Sanitary <br /> Landfill, SanJoaquinCounty, Facility No. 39-AA-0003 <br /> Dear Mr. Horton: <br /> The following summary of the September 4, 1992, meeting between <br /> the California Integrated Waste Management Board (Board) , the <br /> Central Valley Regional Water Quality Control Board (Regional <br /> Water Board) and San Joaquin County Public Health Service (LEA) <br /> staff and representatives from San Joaquin County Department of <br /> Public Works, is intended to serve as a guide to supplement the <br /> above referenced regulatory agencies' comments regarding the <br /> final closure and postclosure maintenance plans for Harney Lane <br /> Sanitary Landfill (Landfill) . Your response to the summarized <br /> comments must be integrated into the final closure and <br /> postclosure maintenance plans as applicable. <br /> 1. It is the understanding of the Board that the owner of the <br /> landfill will be acquiring an engineering firm to design and <br /> cost a landfill gas collection and control system within the <br /> next several weeks. <br /> 2 . A county geologist, Mr. Michael Selling, will be on site at <br /> all times during the excavation, mixing, and construction of <br /> the final cover. The name and a brief resume of the <br /> geologist is to be included in the closure plan Construction <br /> Quality Assurance Manual (CQAM) . <br /> 3 . The County will perform all surveying activities and prepare <br /> maps based upon the survey. <br /> 4. Kleinfelder is the designated Construction Quality Assurance <br /> Officer, and that Kleinfelder will certify the final cover, <br /> pursuant to Title 14, California Code of Regulations (14 <br /> CCR) , Division 7, Chapter 3 , Article 7. 8, Section 17774 . <br /> 5. The engineer of record is responsible for maintaining the <br /> construction quality assurance of the foundation layer and <br /> the barrier layer. The engineer of record, Mr. Gabriel <br /> Karam, will write a letter certifying the entire final cover <br /> assembly once the final cover has been installed and has met <br /> all requirements for operation and CQA. <br /> Printed on Recycled Paper— <br />