Laserfiche WebLink
Stantec <br /> Work Plan for Amended Bioremediation Pilot Study <br /> BP Terminal 40T <br /> November 10, 2008 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of Atlantic Richfield Company, a BP Affiliated Company, for the <br /> express purpose stated above. Any re-use of this report for a different purpose or by others not <br /> identified above shall be at the user's sole risk without liability to Stantec. To the extent that this <br /> report is based on information provided to Stantec by third parties, Stantec may have made <br /> efforts to verify this third party information, but Stantec cannot guarantee the completeness or <br /> accuracy of this information. The opinions expressed and data collected are based on the <br /> conditions of the site existing at the time of the field investigation. No other warranties, <br /> expressed or implied are made by Stantec. <br /> Sincerely, <br /> Stantec Consulting Corporation <br /> ;,,_ Ae—, <br /> Angus E. McGrath, Ph.D. <br /> Principal Geochemist <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Q�oF E SS/oN <br /> Licensed Approver: p q <br /> BENjr0�c�ti <br /> CO s� <br /> LU C5 9 rn <br /> EXP. 31/2008 <br /> /RVus, enkosky, . . <br /> Managing Princal Engineer s�qT civic <br /> ATTACHMENTS OFCAL <br /> Figure 1 –Site Location Map <br /> Figure 2 –Site Plan with Proposed Injection Wells <br /> Table 1 – Bioparameters <br /> Table 2 –Geochemical Parameters <br /> cc: Mr. Sergio Morescalchi, Atlantic Richfield Company (upload to Enfos) <br /> Ms. Debra Portello, BP Terminal HSE Engineer, BP/ARCO Richmond Terminal, 1306 Canal <br /> Blvd, Richmond, CA 94804 <br /> Mr. Scott Murdock, BP Stockton Terminal Manager, Stockton Terminal, 2700 West <br /> Washington Street, Stockton, CA 95203 <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> 40T Work Plan for Amended Bioremediation Pilot Study.doc 9 <br />