My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:42:10 PM
Creation date
5/11/2021 1:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Work Plan for Amended Bioremediation Pilot Study <br /> BP Terminal 40T <br /> November 10, 2008 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of Atlantic Richfield Company, a BP Affiliated Company, for the <br /> express purpose stated above. Any re-use of this report for a different purpose or by others not <br /> identified above shall be at the user's sole risk without liability to Stantec. To the extent that this <br /> report is based on information provided to Stantec by third parties, Stantec may have made <br /> efforts to verify this third party information, but Stantec cannot guarantee the completeness or <br /> accuracy of this information. The opinions expressed and data collected are based on the <br /> conditions of the site existing at the time of the field investigation. No other warranties, <br /> expressed or implied are made by Stantec. <br /> Sincerely, <br /> Stantec Consulting Corporation <br /> ;,,_ Ae—, <br /> Angus E. McGrath, Ph.D. <br /> Principal Geochemist <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Q�oF E SS/oN <br /> Licensed Approver: p q <br /> BENjr0�c�ti <br /> CO s� <br /> LU C5 9 rn <br /> EXP. 31/2008 <br /> /RVus, enkosky, . . <br /> Managing Princal Engineer s�qT civic <br /> ATTACHMENTS OFCAL <br /> Figure 1 –Site Location Map <br /> Figure 2 –Site Plan with Proposed Injection Wells <br /> Table 1 – Bioparameters <br /> Table 2 –Geochemical Parameters <br /> cc: Mr. Sergio Morescalchi, Atlantic Richfield Company (upload to Enfos) <br /> Ms. Debra Portello, BP Terminal HSE Engineer, BP/ARCO Richmond Terminal, 1306 Canal <br /> Blvd, Richmond, CA 94804 <br /> Mr. Scott Murdock, BP Stockton Terminal Manager, Stockton Terminal, 2700 West <br /> Washington Street, Stockton, CA 95203 <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> 40T Work Plan for Amended Bioremediation Pilot Study.doc 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.