Rantec <br /> Work Plan for Amended Bioremediation Pilot Study <br /> BP Terminal 40T <br /> November 10, 2008 <br /> In the event that concentration levels of sulfate exceed the baseline levels by more than 20% at <br /> the point of compliance, AR/MW-1 A, the following steps will be taken: <br /> • Sulfate injections will be put on hold; <br /> • AR/MW-1A will be re-sampled and analyzed to verify the concentration levels; <br /> • If levels still exceed the concentrations limits, a monthly monitoring program will be <br /> introduced; <br /> • If the trend is stable at a concentration above background or increasing after three <br /> months the use of injection will be reevaluated; and <br /> • The wells will be monitored bi-weekly until the levels fall below the concentration <br /> limits, at which time the groundwater treatment system will be stopped. <br /> Transport Evaluation <br /> Stantec proposes adding a tracer compound, such as bromide, to the injection solution in order <br /> to evaluate the rate of transport at the site. This information will be used to determine the <br /> injection well design for a full scale system. All A-zone wells will be sampled for the tracer <br /> compound monthly in order to determine the rate of transport. <br /> Baseline Parameters <br /> The objective of the sulfate injection plan is to elevate the level of these compounds in the <br /> impacted zone. URS submitted revised baseline levels during their pilot study. These levels <br /> are proposed for use during this expanded pilot study. If the baseline levels shown below are <br /> exceeded by 20%, the corrective actions indicated above will be implemented. <br /> Compound Proposed Baseline Level m /L <br /> Calcium 70.9 <br /> Sulfate as SO4 27 <br /> Total Suspended Solids 680 <br /> Total suspended solids concentrations will be determined based on background evaluations that <br /> are currently scheduled to be collected during the first week of November. A status letter will be <br /> submitted with the results confirming what BP requests as Baseline Levels. <br /> Reporting <br /> Performance evaluation reports will be prepared and submitted on a quarterly basis during the <br /> pilot study. A summary report for will be prepared and submitted to the RWQCB upon <br /> completion of the pilot study. The report will document field activities, present field and <br /> analytical data, and provide conclusions and recommendations. <br /> Waste Discharge Requirements <br /> Upon RWQCB approval of this work plan and concurrence with Baseline Levels, BP will file a <br /> Notice of Intent to Order No. R5-2008-0149 Waste Discharge Requirements General Order for <br /> In-situ Groundwater Remediation at Sites with Volatile Organic Compounds, Nitrogen <br /> Compounds, Perchlorate, Pesticides, Semi-volatile Compounds, Hexavalent Chromium and/or <br /> Petroleum Hydrocarbons within 45 days. <br /> 40T Work Plan for Amended Bioremediation Pilot Study.doc 8 <br />