My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:42:10 PM
Creation date
5/11/2021 1:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Work Plan for Feasibility Study <br /> BP Stockton Terminal No. 40T <br /> June 17, 2009 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP Affiliated Company, for the express purpose <br /> stated above. Any re-use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec. To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> nan Egger Brian Westhoff <br /> Project Scientist Geologic Consultant <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: QROFEBSS/ <br /> O <br /> l <br /> y O <br /> c� � <cm <br /> usty nkos P.E. � C 58rn <br /> Managing Pr ipal Engineer * EXP.121 1!2010 <br /> June 17, 2009 sT9lFOCIV I <br /> FC <br /> cc: Mr. Sergio Morescalchi, Atlantic Richfield Company (upload to Enfos) <br /> Ms. Debra Portello, BP Terminal HSE Engineer, BP/ARCO Richmond Terminal, 1306 Canal <br /> Blvd, Richmond, CA 94804 <br /> Mr. Michael Peterson, BP Stockton Terminal Manager, Stockton Terminal, 2700 West <br /> Washington Street, Stockton, CA 95203 <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> 0040T Work Plan for Feasibility Study.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.