Laserfiche WebLink
Stantec <br /> Work Plan for Feasibility Study <br /> BP Stockton Terminal No. 40T <br /> June 17, 2009 <br /> ATTACHMENTS <br /> Figure 1 —Site Location Map <br /> Figure 2—Site Plan—Ariel View <br /> Figure 3—Site Plan <br /> Table 1 — Recent Groundwater Analytical Data <br /> Table 2— Recent Groundwater Oxygenate and Fuel Additive Analytical Data <br /> Table 3—Groundwater Elevation and Product Thickness Data — First Quarter 2009 <br /> Table 4— Historical Groundwater Flow Direction <br /> Table 5— Historical Vertical Groundwater Gradient Data <br /> Table 6—Well Construction Details <br /> Attachment A— Response Letter for RWQCB letter dated April 8, 2009 <br /> Attachment B—Site History and Previous Investigations <br /> 0040T Work Plan for Feasibility Study.doc 5 <br />