Laserfiche WebLink
Work Plan—Soil Boring Installation Page 5 <br /> Malott's Honda Yamaha <br /> Project 328.2 <br /> August 27, 2001 <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geo-Phase Environmental Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geo-Phase Environmental Inc. is not responsible for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> Geo-Phase Environmental Inc. � pGEIL�sr <br /> pEo 4283 <br /> Stephen M LanOrd, srgTf of C���E� <br /> Registered Geologist#4283 <br /> 2937 Veneman Avenue,Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />