Laserfiche WebLink
Work Plan—Soil Boring Installation Page 4 <br /> Malott's Honda Yamaha <br /> Project 328.2 <br /> August 27, 2001 <br /> 3.0 REPORTING <br /> The information gathered during this phase of work will be presented in a report, which will <br /> include a description of the field work, results of sample analyses, and their implications. <br /> The report will be prepared and signed by a registered geologist responsible for the work. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209) 569-0295 <br />